User Tools

Site Tools


lbaops:lbamay2010:v252qatlog

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:lbamay2010:v252qatlog [2010/05/06 12:34]
ste616
lbaops:lbamay2010:v252qatlog [2015/12/18 16:38] (current)
Line 8: Line 8:
  
 Rephasing of the array was done at 02:32:20, on 0537-441. Rephasing of the array was done at 02:32:20, on 0537-441.
 +
 +ATCA got antenna 4 back, and enabled it, during the slew at 06:12. It took less than 20 seconds to get back to slewing.
 +
 +Rephased array ar 10:32 UT
 +
lbaops/lbamay2010/v252qatlog.txt · Last modified: 2015/12/18 16:38 (external edit)