User Tools

Site Tools


lbaops:lbamay2011:v448btilog

Recording to ATNF-V011/A1-A7 mounted as /data/xraid1

10:34:44 UT, on calibrator from, then started Cir X-1 from 10:42:00 following the schedule.

11:00 UT, stop.

18:12:50 on point again

18:36:00 boresight in xEl on 1551-55, -6mdeg errors, left with -4mdeg offset

18:42:00 -6 mdeg offset confirmed, left with -6mdeg from now on

18:47:00 boresight in El, -2 mdeg offset applied

22:00:00 end of schedule

lbaops/lbamay2011/v448btilog.txt · Last modified: 2015/12/18 16:38 by 127.0.0.1