User Tools

Site Tools


lbaops:lbamay2013:vx017atilog

Recording LCP only for CH2

10:37 Fixed 2ndLO to 448MHz (has been 468MHz)

10:39 Fringe confirmed.

10:55:00-11:08:00 Missed 1st phase cal source as 70m was still slewing

11:08:35 on source (pulsar)

11:36:55 fringe on phase cal source confirmed

13:20:24 antenna stowed

18:17:01 back on source

19:15:05 stopped observation

Note on 2 July 2013 - Tsys file and flag table have been uploaded to incoming ftp directory.

lbaops/lbamay2013/vx017atilog.txt · Last modified: 2015/12/18 16:38 by 127.0.0.1