User Tools

Site Tools


lbaops:lbanov2005:v187a

v187a Setup:

Antennas Pa-At-Mp-Ho-Cd
Start 306 05:00:00
Stop 307 04:56:00
PI Roopesh Ojha
Channel 1 8417 - 8433 MHz USB RCP
Channel 2 8417 - 8433 MHz USB LCP
Bandwidth 16 MHz
Recorder S2
DAS Mode at16s.pro
S2 Mode 32×4-2
Buggary Cable in
Tape Change 306 10:56:00
Tape Change 306 16:56:00
Tape Change 306 22:56:00

Ftp: ftp://ftp.atnf.csiro.au/pub/people/vlbi/v187/v187a


Comments:

Alternatively use S2 mode 32a4-2 without buggary cable. Either edit .skd file before running drudg, or edit .prc file after running drudge


Results from Oct 2008 AIPS (with Hobart mount). data path TABED – fix the AN table (use new versions of ATLOD) CLCOR – apply feed rotation corrections: CL#2 FRING – Find solutions: SN#4 SNCOR – Copy sols from POL 1 to POL 2 CLCAL – Apply: CL#3 FRING – Find delays for RR to LL: SN#5 SNCOR – Zero Rate and Phase CLCAL – Apply average delay: CL#4 CALIB – find phase difference: SN#6 CLCAL – Apply: CL#5

Repeat SN#4-6 to CL#1 to produce CL#6,7,8

The plot shows the difference in the phases between RR and LL for V187A (1& 2) and B (3&4), with (1&3) and without (2&4) corrections.

Ftp: ftp://ftp.atnf.csiro.au/pub/people/vlbi/incoming/v187_vplot_rr-ll.ps

lbaops/lbanov2005/v187a.txt · Last modified: 2015/12/18 16:38 by 127.0.0.1