Antennas | Pa-At-Mp-Ho-Cd |
---|---|
Start | 306 05:00:00 |
Stop | 307 04:56:00 |
PI | Roopesh Ojha |
Channel 1 | 8417 - 8433 MHz USB RCP |
Channel 2 | 8417 - 8433 MHz USB LCP |
Bandwidth | 16 MHz |
Recorder | S2 |
DAS Mode | at16s.pro |
S2 Mode | 32×4-2 |
Buggary Cable | in |
Tape Change | 306 10:56:00 |
Tape Change | 306 16:56:00 |
Tape Change | 306 22:56:00 |
Ftp: ftp://ftp.atnf.csiro.au/pub/people/vlbi/v187/v187a
Alternatively use S2 mode 32a4-2 without buggary cable. Either edit .skd file before running drudg, or edit .prc file after running drudge
Results from Oct 2008 AIPS (with Hobart mount). data path TABED – fix the AN table (use new versions of ATLOD) CLCOR – apply feed rotation corrections: CL#2 FRING – Find solutions: SN#4 SNCOR – Copy sols from POL 1 to POL 2 CLCAL – Apply: CL#3 FRING – Find delays for RR to LL: SN#5 SNCOR – Zero Rate and Phase CLCAL – Apply average delay: CL#4 CALIB – find phase difference: SN#6 CLCAL – Apply: CL#5
Repeat SN#4-6 to CL#1 to produce CL#6,7,8
The plot shows the difference in the phases between RR and LL for V187A (1& 2) and B (3&4), with (1&3) and without (2&4) corrections.
Ftp: ftp://ftp.atnf.csiro.au/pub/people/vlbi/incoming/v187_vplot_rr-ll.ps