The data for v189a should be recorded to the first of the new sets of xraids (7 x 500 GB)\ \ Data being recorded to first set of Xraid disks as labeled: /data/xraid0. Interestingly this is the right-hand bank of disks.\ \ Data recorded as follows:\ \ 09:50:00 → 09:50:30 - duration was set to 30s, whoops!\ 09:58:00 → 10:27:12 Stopped to reconfigure caching settings on the Xraids\ 10:28:00 → end\ \ Notes:\ 09:50:00 On point and recording\ 12:28:00 (approx time) IF2 unplugged briefly for a sanity check\ 12:37:00 Antenna off point for ~ 30s for another sanity check\ 12:42:00 After conversation with Adam, can see no problems with the \

          system so suspect lack of fringes to Tid is due to checking \
          software not handling the mixture of bands and pols correctly. \
          Have double checked frequency setup, antenna pointing, recorder\
          clock etc and all looks correct.\

\ \ –\ \

Tidbinbilla Setup notes for V189a\

\

Config notes\

  • Centre freqs = 1650, 1682 MHz MHz\
  • Polarisation = LCP\
  • 1st LO = 1380 MHz\
  • mix to 160 MHz into DAS\
  • so 2nd LO for USB mix \
    • IFP1: 1650 - 1380 + 160 = 430 MHz\
    • IFP1: 1682 - 1380 + 160 = 462 MHz\
  • DAS profile = vsop_f.pro\

\ \

SOE\

Before the track\

  • Block 0 rack config\
    • Split L-band signal then amplify, attennuate, mix etc to IFP1, 2\
    • 2nd LOs\
      • 1: 430 MHz\
      • 2: 462 MHz\
  • PCFS\
    • sched files\
      • fix timing\
      • add source commands\
    • modify PRC file\
      • VFC patching\
        • patch in L-band and set LOs to 286 MHz (1666 MHz Sky)\
      • S2 config\
  • start DAS software\
    • configuration vsop_f.pro\
    • adjust attenuators\
  • tidvsi\
    • 203.5.58.205 (admin LAN only, use jplvisitor account)\
    • check time\
    • use disko\
    • vsib_record -m 3 -c xxxx -e /dev/vsib -t 32400s -o /blah/v189a-ti\
      • configure and start\
  • xplot\
    • on pcfs40: /usr2/st/vlbisrv/start_vlbisrv dflt\
    • on eac40: /opt/rmc/bin/xplot -rh pcfs40\
  • start PCFS software\
    • ssh ops@pcfs40\
    • pcfsa-remote\
      • S2, S-RCP, S-LCP, maintenance\
    • start the schedule\
    • configure VFCs with ifds and vclba\

At start of track\

  • NMC\
    • Link\
      • Build link with antenna and receiver, spacecraft 50 (VLBI), pass 0, two receivers.\
    • antenna startup\
      • in NMC:CTRL Connection Control:\
        • AP D TRK (to show the track display)\
          • Check for:\
          • * delut ~ +229 ms\
          • * models for encoder and position should be 3SPIG.AC1 and 3SCIB.SEM respectively\
        • ap band s\
        • ap move r=240\
        • ap semn 3spig.ac2\
        • ap semn 3scib.sem\
        • ap radec 9.63649 -24.94850 (j0038-24)\
        • ap mode ac2\
        • ap d sts (check all green. click on antenna to see brakes status)\
        • ap trk (start the antenna)\
        • (make safety page)\
        • ap resm trk\
    • start three connection blocks\
      • connection blocks → NDcontrol (Note PID)\
      • connection blocks → UWVcontrol (Note PID)\
      • connection blocks → APCcontrol (Note PID)\
    • start the E-log TDN\
      • TDNs → log? \
      • move to 'logs' workspace\
    • receiver config\
      • us d smap\
      • us d xmap\
      • (double-click on dichroic to move it IN)\
      • (configure with double-clicks)\
      • D1 D CNF 3\
      • (select SC 99 and S band and [apply])\
      • make carrier 2280 MHz\
      • if fail to pick up correct LNA:\
        • D1 set uwv reset\
        • d1 set uwv srla2o2\
      • D2 D CNF 4\
      • (select SC 99 and S band and [apply])\
      • make carrier 2280 MHz\
      • if fail to pick up correct LNA:\
        • select connection “none”\
        • select connection DSS43SO2\
      • if still failing\
        • D1 set uwv reset\
        • d1 set uwv srla2o2\
      • configure noise diode\
        • d1 d prf 3 and d2 d prf 4\
        • click on REC button in CNF windows\
        • select 12.5K and frequency = on, apply\
        • then enable/disable, check in each IF\
        • to modulate\
        • * 0.25 K, 20 Hz, 5s, enable\
        • repeat for D2\

\

  • boresight\
    • manual offsets e.g:\
      • ap po xel 0.1\
  • PCFS\
    • check atten levels\

\ \

  • schedule file changes\

remove all:\ st=\ et\ unlod\ setup0*\ ready\ tape\ \ Add to prc file:\ \ define ifds 06132201809x \ ifd=,,nor,nor \ lo=lo1,1380,usb,lcp,1.0,0 \ patch=lo1,1h,2h,3h,4h,5h,6h,7h,8h,9h,10h,11h,12h,13h,14h \ enddef\ define vclba 06132201825x \ vc01=285.99,16.00,ul\ vc02=285.99,16.00,ul\ vc03=285.99,16.00,ul\ vc04=285.99,16.00,ul\ vc05=285.99,16.00,ul\ vc06=285.99,16.00,ul\ vc07=285.99,16.00,ul\ vc08=285.99,16.00,ul \ vc09=285.99,16.00,ul \ vc10=285.99,16.00,ul \ vc11=285.99,16.00,ul \ vc12=285.99,16.00,ul \ vc13=285.99,16.00,ul \ vc14=285.99,16.00,ul \ !+1s\ valarm\ enddef\ define postob 00000000000x\ enddef\ define sched_end 00000000000x \ sy=echo “QUIT” | netcat nmc-ws4 -q 2 6543\ sy=echo “QUIT” | netcat nmc-ws4 -q 2 6643\ sy=echo “TERMINATE” | netcat nmc-ws4 -q 2 6743\ enddef\ \ \ \ \ \