User Tools

Site Tools


lbaops:lbanov2008:v252itilog

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:lbanov2008:v252itilog [2008/11/28 04:29]
shoriuchi
lbaops:lbanov2008:v252itilog [2015/12/18 16:38] (current)
Line 1: Line 1:
-11:09:58 started recording to SWIN-V019B1-7 
  
-11:14:00 on point for 0454-463, fringes confirmed,+332:11:09:58 started recording to SWIN-V019B1-7 
 + 
 +332:11:14:00 on point for 0454-463, fringes confirmed,
  manual slewing until Tid official start time of 1150z  manual slewing until Tid official start time of 1150z
  
-11:40:00-11:55 Spend all time for slewing to and from 2104-413+332:11:40:00-11:55 Spend all time for slewing to and from 2104-413 
 + 
 +332:14:40:00 Switched from 12K noise diode to 0.25 K one 
 + 
 +332:17:15 It started rain.. 
 + 
 +332:18:25 Rain stopped 
 + 
 +333:04:26:38 Rain started 
 + 
 +333:04:46:30 two dodgy high wind speed alarms. Actual speed approx 18mph indicated at 124kmh. 
 + 
 +333:04:47:25 heavy rain 
 + 
 +333:06:00:26 rain pretty much cleared 
 + 
 +333:08:04:11 Observations complete
  
-14:40:00 Switched from 12K noise diode to 0.25 K one 
  
-15:15 It started rain.. 
  
  
lbaops/lbanov2008/v252itilog.1227806990.txt.gz · Last modified: 2015/12/18 16:38 (external edit)