User Tools

Site Tools


lbaops:lbanov2008:v271bpalog

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:lbanov2008:v271bpalog [2008/11/28 21:51]
guest
lbaops:lbanov2008:v271bpalog [2015/12/18 16:38] (current)
Line 1: Line 1:
- ​- ​Missed scan starting at 10:42:54 due to switching from generator to mains power. ​ +Missed scan starting at 10:42:54 due to switching from generator to mains power. ​ Schedule resumed as normal after this 
-   Schedule resumed as normal after this+ 
 +Wind Stow at 03:14 UT.  Back on source at 04:56UT. 
lbaops/lbanov2008/v271bpalog.txt · Last modified: 2015/12/18 16:38 (external edit)