User Tools

Site Tools


lbaops:lbanov2011:v252abtilog

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
Next revisionBoth sides next revision
lbaops:lbanov2011:v252abtilog [2011/11/14 01:11] shoriuchilbaops:lbanov2011:v252abtilog [2011/11/14 19:58] shoriuchi
Line 1: Line 1:
 +Recording to ATNF V011/A1-A7 mounted as /data/xraid0
 +
 +DSS-43 (70m) X-band
 +
 +IF1 RCP->LNA1->D/C1, 2ndLO 485 MHz
 +
 +IF2 RCP->LNA1->D/C2, 2ndLO 517 MHz
 +
 +DOY 317 
 +
 +14:01:40 DSS-43 started 1st source
  
 18:40:00 halted  18:40:00 halted 
Line 5: Line 16:
  
 04:09:40 DSS-43 resumed on point 04:09:40 DSS-43 resumed on point
 +
 +04:55:00 Switch to DSS-45 
 +
 +05:50:00 change backend patching to adjust gain as IF2 power level on DAS has been low 
 +
 +06:24:20 power looks finally normal after tweaking the patching. 
 +
 +06:58:01 Fringe confirmed
lbaops/lbanov2011/v252abtilog.txt · Last modified: 2015/12/18 16:38 by 127.0.0.1