User Tools

Site Tools


lbaops:lbanov2011:v252abtilog

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Last revisionBoth sides next revision
lbaops:lbanov2011:v252abtilog [2011/11/14 15:17] shoriuchilbaops:lbanov2011:v252abtilog [2011/11/15 01:01] shoriuchi
Line 16: Line 16:
  
 04:09:40 DSS-43 resumed on point 04:09:40 DSS-43 resumed on point
 +
 +04:55:00 Switch to DSS-45 
 +
 +05:50:00 change backend patching to adjust gain as IF2 power level on DAS has been low 
 +
 +06:24:20 power looks finally normal after tweaking the patching. 
 +
 +06:58:01 Fringe confirmed
 +
 +14:00:00 End of schedule
 +
lbaops/lbanov2011/v252abtilog.txt · Last modified: 2015/12/18 16:38 by 127.0.0.1