Line 16: | Line 16: | ||
04:09:40 DSS-43 resumed on point | 04:09:40 DSS-43 resumed on point | ||
+ | |||
+ | 04:55:00 Switch to DSS-45 | ||
+ | |||
+ | 05:50:00 change backend patching to adjust gain as IF2 power level on DAS has been low | ||
+ | |||
+ | 06:24:20 power looks finally normal after tweaking the patching. | ||
+ | |||
+ | 06:58:01 Fringe confirmed | ||
+ | |||
+ | 14:00:00 End of schedule | ||
+ |