User Tools

Site Tools


lbaops:lbanov2012:v471batlog

CA01-05 tied together.

Phase cal before start of run. Atmospheric conditions good, seemon < 200 microns.

08:41UT pcal at start of scan 9 (1934-639). P=996hPa, T=27C, R.H.=31%, wet path=90mm, wind ~5km/hr.

12:23UT do another pcal near start of scan 20 (1903-902)

lbaops/lbanov2012/v471batlog.txt · Last modified: 2015/12/18 16:38 by 127.0.0.1