User Tools

Site Tools


lbaops:lbaoct2012:re02ltilog

DOY 281

19:00:00 started recording while 70m is slewing

19:10:00 doing boresight

19:12:00 offset El -000218 xEl -0.00228

19:13:00 minical

19:13:50 western offset

19:15:15 ON POINT

19:38:00 observation stopped as it's been canceled!!!

20:20:00 on Orion-KL and recording for test

fauto spectrum confirmed with lines on IF2 on both pol

20:39:00 stop recording

lbaops/lbaoct2012/re02ltilog.txt · Last modified: 2015/12/18 16:38 by 127.0.0.1