DAS profile vsop_f.pro
DOY 293
17:11:57 Tid70m on point, recoding Ch1-2 (RCP) only and wrong freq. set by mistake (445MHz as per 485 MHz required)
17:14:20 Fringe test showed no fringes for Tid
17:29:40 Fringe confirmed but only for LCP
17:36:00 RCP frequency corrected
17:40:10 confirmed fringes with Tid70m at both RCP and LCP
17:36:53 DSS-35 started, recording data to DVP until 20:55
18:46:03 Tid70m finished, IF inputs for LBA-DR switched over to DSS-35 RCP/LCP.
20:55:35 DSS-35 finished observation