User Tools

Site Tools


lbaops:lbaoct2018:rg39datlog

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

lbaops:lbaoct2018:rg39datlog [2018/10/29 09:48]
maxvoronkov created
lbaops:lbaoct2018:rg39datlog [2018/10/29 10:05] (current)
maxvoronkov
Line 1: Line 1:
-ATCA on schedule at 22:48 UT. +ATCA on schedule at 22:48 UT, however the fringe is rather weakPhase stability is bad and the array is in a rather extended 750A configuration. Dropped antennas from tied array at 22:59 (only have single 4-5 baseline left, which is about 77m)
lbaops/lbaoct2018/rg39datlog.txt · Last modified: 2018/10/29 10:05 by maxvoronkov