User Tools

Site Tools


lbaops:lbasep2009:v255fholog

From about 4:40/247 UT/DOY until 4:56/247 we lost the external reference phase lock on the 2nd LO. The oscillator was accidentally turned off and the LO signal was also lost for a minute or two, before the unit was turned back on. Observer, Warren.

The DAS aborted at UT 10:08. I restarted with vsop.pro. Shortly after I checked coherence and did not find it. I reprogrammed the das using profile vsop_ho.pro. This time I got coherence. Finished at 10:30 UT. jd

Recording to disks UTAS V001A (I think). Claire

lbaops/lbasep2009/v255fholog.txt · Last modified: 2015/12/18 16:38 by 127.0.0.1