User Tools

Site Tools


lbaops:lbasep2009:v255fholog

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
lbaops:lbasep2009:v255fholog [2009/09/04 15:27]
breid
lbaops:lbasep2009:v255fholog [2015/12/18 16:38] (current)
Line 1: Line 1:
 +From about 4:40/247 UT/DOY until  4:56/247 we lost the external reference phase lock on the 2nd LO.
 +The oscillator was accidentally turned off and the LO signal was also lost for a minute or two, before the unit was turned back on.
 +Observer, Warren.
 +
 The DAS aborted at UT 10:08.  I restarted with vsop.pro.  Shortly after I checked coherence and did not find it.  I reprogrammed the das using profile vsop_ho.pro.  This time I got coherence.  Finished at 10:30 UT.  jd The DAS aborted at UT 10:08.  I restarted with vsop.pro.  Shortly after I checked coherence and did not find it.  I reprogrammed the das using profile vsop_ho.pro.  This time I got coherence.  Finished at 10:30 UT.  jd
 +
 +Recording to disks UTAS V001A (I think). Claire
  
  
lbaops/lbasep2009/v255fholog.1252042041.txt.gz · Last modified: 2015/12/18 16:38 (external edit)