User Tools

Site Tools


lbaops:lbasep2012:v252aetilog

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:lbasep2012:v252aetilog [2012/09/17 01:13]
shoriuchi
lbaops:lbasep2012:v252aetilog [2015/12/18 16:38] (current)
Line 25: Line 25:
 09:47:00 fringe confirmed  09:47:00 fringe confirmed 
  
-09:49:40-09:59:40  source (1454-354) skipped because too long slew in Az required+09:49:40-09:59:40 No0084 (1454-354) skipped because too long slew in Az required
  
 10:02:56 on point for the next scan 10:02:56 on point for the next scan
Line 33: Line 33:
 14:59:12 late on source after big slew  14:59:12 late on source after big slew 
  
-14:59:40-15:09:40 skipped because too long slew in Az required+14:59:40-15:09:40 No.0115 (2155-304) skipped because too long slew in Az required
  
-16:19:40-16:29:40 scan is to be skipped because too long slew in Az required+16:19:40-16:29:40 No.0123 (0402-362) skipped because too long slew in Az required
  
 18:59:40 planned antenna stow 18:59:40 planned antenna stow
lbaops/lbasep2012/v252aetilog.txt · Last modified: 2015/12/18 16:38 (external edit)