User Tools

Site Tools


lbaops:lbasep2014:v527bholog

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
lbaops:lbasep2014:v527bholog [2014/09/20 06:56]
breid
lbaops:lbasep2014:v527bholog [2015/12/18 16:38] (current)
Line 1: Line 1:
-Stopped due to wind at 8:45 UT and have not resumed.+Fringes detected in all channels to parkes 
 + 
 +proc file edited to use alt inputs & correct patching. 
 + 
 +define ​ ifd01         ​14262193911x 
 +ifd=17,​9,​alt,​alt 
 +if3=5,​in,​2,​1,,,​on 
 + 
 +Using sam26m Tsys rather than mark4 rack due to uncertainty in noise diode calibration. 
 + 
 +Stopped due to wind at 8:45 UT and has not resumed.
  
  
lbaops/lbasep2014/v527bholog.txt · Last modified: 2015/12/18 16:38 (external edit)