User Tools

Site Tools


lbaops:telecon2009may21

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
lbaops:telecon2009may21 [2009/06/09 18:39]
guest
lbaops:telecon2009may21 [2015/12/18 16:39] (current)
Line 76: Line 76:
     *  ** Prepare checklist for procedures for next session. (Claire)**     *  ** Prepare checklist for procedures for next session. (Claire)**
     *  ** Get observers to update disk usage on wiki (all) **     *  ** Get observers to update disk usage on wiki (all) **
-    *  ** Determine contact persons at telescopes for disk changes (Phil) **+    *  ** Determine contact persons at telescopes for disk changes (Phil) ** ** DONE! (Jamie at Narrabri; Ettore at Parkes) **
     *  ** Prepare for 2nd phase of implementation of transfers, to include Hobart, Tid (via Canberra ARCS node) and Ceduna (via Adelaide ARCS node). Will need XRAIDs at ARCS nodes. To be explored with ARCS contacts (Steven).**     *  ** Prepare for 2nd phase of implementation of transfers, to include Hobart, Tid (via Canberra ARCS node) and Ceduna (via Adelaide ARCS node). Will need XRAIDs at ARCS nodes. To be explored with ARCS contacts (Steven).**
  
Line 98: Line 98:
 OTHER OTHER
  
-  *  ** VLBI ASKAP proposal from EoI. Draft to be circulated. (Steven) **+  *  ** VLBI ASKAP proposal from EoI. Draft to be circulated. (Steven) ​** ** DONE **
  
   *  ** Collaborations with South America may be possible, to compensate for loss of Hart. TIGO (Chile), O'​Higgins (Antarctica),​ Fortaleza (Brazil) & antenna in Peru. Tasso to investigate. **   *  ** Collaborations with South America may be possible, to compensate for loss of Hart. TIGO (Chile), O'​Higgins (Antarctica),​ Fortaleza (Brazil) & antenna in Peru. Tasso to investigate. **
lbaops/telecon2009may21.1244536782.txt.gz · Last modified: 2015/12/18 16:39 (external edit)