User Tools

Site Tools


lbaops:telecon2010aug04

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

lbaops:telecon2010aug04 [2010/08/04 15:58]
tasso
lbaops:telecon2010aug04 [2015/12/18 16:39]
Line 1: Line 1:
-====== ​ VLBI teleconference,​ 04 August 2010 ====== 
-=====  12.00 Perth, 14.00 Eastern, 16.00 New Zealand ===== 
  
-Phone: 
- 
-| Vic:|03 9545 8222 | 
-| NSW:|02 9490 8022 | 
-| ACT:|02 6276 6622 | 
-| Qld:|07 3214 2311 | 
-|  WA:|08 6436 8844 | 
-|  SA:|08 8273 8122 | 
-|  NT:|08 8944 8488 | 
-| Tas:|03 6232 5188 | 
-Meeting ID: 4554 
- 
-Chair: Tasso Tzioumis 
- 
-Attendance: Cormac Reynolds, Hayley Bignall(Curtin);​ Tasso Tzioumis, Chris Phillips, Phil Edwards, John Reynolds (ATNF Marsfield); Jamie Stevens (ATNF, Narrabri); Jamie McCallum, Brett Reid (UTas, Mt Pleasant); Richard Dodson, Maria Rioja (UWA); Shinji Horiuchi (SDCCC, Canberra) 
- 
-Apologies: Steven Tingay, Randall Wayth (Curtin); Simon Ellingsen (UTas); Tim Natush, Sergei Gulyaev (Auckland); Jonathan Quick (Hart) 
- 
-**Agenda** 
- 
-  *  Debrief from VLBI session July (22-27) & ToOs 
-    *  ATNF 
-    *  UTas 
-    *  Tid 
-    *  Data transfers 
-    *  IKAROS observations 
-    *  General comments 
- 
-  *  Reports from observatories & correlator(s) 
-    *  ATNF 
-    *  UTas 
-    *  Curtin 
-      *  ATCA delay jumps 
-    *  Tid 
-      *  Xraid problems 
-    *  NZ 
-    *  AuScope 
-    *  Hart 
- 
-  *  Next session(s) for VLBI 
-    *  Proposals & scheduling 
-    *  Issues 
- 
-  *  * Review of [[lbaops:​telecon2010july09| Actions from last meeting 09 July 2010]] 
- 
-  *  Any other issues 
- 
- 
-**Actions arising**  ​ 
- 
-+CARRIED FORWARD/​UPDATED+ 
-  *  Consolidation of the LBA Archive to include all ATNF + Swinburne + Curtin correlated LBA data. Should also add in eVLBI output data. Maintain complete archives at Curtin and ATNF (ATNF/​Curtin) 
-    *  ATNF to develop online access to this archive (ATNF) ** - Continuing ** 
- 
-  *  Implement Mk5b eVLBI operation (Chris) -** postponed till Mk5b eVLBI tests are feasible later in the year. ** 
-  *  Mk5b operations at correlator (Curtin) ** - continuing ** 
-    *  Mk5b test data to Curtin (UTas) 
-    *  Test with Mopra (Chris, UTas) 
-    *  Parallel LBA amd Mk5 test data (UTas, Cormac) - ** to be arranged ** 
-  
-  *  Notify WEW of times of any ATCA delay jumps (Correlators) 
- 
-  *  Correlate Boolardy geodetic data to get better position, before next session. (Curtin) ​ ** - in queue ** 
- 
-+NEW ACTION ITEMS+ 
- 
-  *  Test ATCA data from the vlbi_64_1_tda mode and compare 64 MHz and 1 MHz modes (Jamie S.) 
-    *  Guidelines for phasing the atca more often during vlbi observations (ATNF) 
-    *  Clarify availability of atca data during VLBI. Include in letter to PIs to allow informed choice (ATNF) 
-  *  Inform PIs of ~150ns delay difference in polarizations at the atca (ATNF, Correlator) 
-  *  Publicise availability of OH and S-band form next period at atca due to the L/S upgrade.(ATNF) 
- 
-  *  UTas is implementing a pre-planning meeting to plan Rx setups and avoid mix-ups. Must have setup instructions at least 2 days before session. (UTas) 
-  *  New equipment in Ceduna town to mitigate interference to wi-fi link to the telescope. New 5 GHz wi-fi operation. (UTas) 
- 
-  *  Address XRAID issues at Tid. Power-cycle testing and/or upgrade hardware. Swinburne could be source of XRAID. (Shinji, Chris) 
-  *  Urgent input to JPL re Tid scheduling beyond 25 Oct. (Shinji, Phil) 
- 
-  *  Check cx016b data and correlate full dataset when all data at Curtin. (Correlator) 
- 
-  *  Implement upgrade for programmable cable changes on VLBI DAS. Testing needed. (Chris, Jamie S) 
-  *  Fix faulty CAVE nodes (04 and 07) - (Chris) 
-  *  Test Mp lo_setup after synthesiser upgrade. Test cm observation online and need full test for K-band (ATNF, Tasso) 
- 
- 
-Next meeting: TBD 
lbaops/telecon2010aug04.txt · Last modified: 2015/12/18 16:39 (external edit)