lbaops:telecon2010july09

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:telecon2010july09 [2010/08/04 13:58]
tasso
lbaops:telecon2010july09 [2015/12/18 16:39] (current)
Line 49: Line 49:
   *  cdisko developments (Jamie Stevens and Chris Phillips) - ** Major update completed. Incremental improvements continuing. **   *  cdisko developments (Jamie Stevens and Chris Phillips) - ** Major update completed. Incremental improvements continuing. **
   *  Mk5 disk acquisition (ATNF/​Curtin) - ** Completed with 14 x 8TB disk-packs bought by ATNF in early 2010. **   *  Mk5 disk acquisition (ATNF/​Curtin) - ** Completed with 14 x 8TB disk-packs bought by ATNF in early 2010. **
 +
 +** // ** List below annotated on 4/​8/​10// ​ **
  
 CARRIED FORWARD CARRIED FORWARD
   *  Consolidation of the LBA Archive to include all ATNF + Swinburne + Curtin correlated LBA data. Should also add in eVLBI output data. Maintain complete archives at Curtin and ATNF (ATNF/​Curtin)   *  Consolidation of the LBA Archive to include all ATNF + Swinburne + Curtin correlated LBA data. Should also add in eVLBI output data. Maintain complete archives at Curtin and ATNF (ATNF/​Curtin)
-    *  ATNF to develop online access to this archive (ATNF)+    *  ATNF to develop online access to this archive (ATNF) ​** - Continuing **
  
  
 NEW Action Items NEW Action Items
-  *  Investigate more efficient VLBI observing support at Parkes. Current actions mainly pushing the alarm button. Check possibilities of local support (Tasso)+  *  Investigate more efficient VLBI observing support at Parkes. Current actions mainly pushing the alarm button. Check possibilities of local support (Tasso) ​** - to be revisited after remote control implemented at Parkes next February. **
  
-  *  Implement Mk5b eVLBI operation ​and (Chris) +  *  Implement Mk5b eVLBI operation (Chris) ​-** postponed till Mk5b eVLBI tests are feasible later in the year. ** 
-  *  Mk5b operations at correlator (Curtin)+  *  Mk5b operations at correlator (Curtin) ​** - continuing **
     *  Mk5b test data to Curtin (UTas)     *  Mk5b test data to Curtin (UTas)
     *  Test with Mopra (Chris, UTas)     *  Test with Mopra (Chris, UTas)
-    *  Parallel LBA amd Mk5 test data (UTas, Cormac)+    *  Parallel LBA amd Mk5 test data (UTas, Cormac) ​- ** to be arranged **
  
-  *  Consult with WEW on cause of intermittent clock jumps and delay between polarisations in Dec'09 data (ATNF)+  *  Consult with WEW on cause of intermittent clock jumps and delay between polarisations in Dec'09 data (ATNF) ​** - changed to notifying WEW of times of jumps. **
  
-  *  Correlate Boolardy geodetic data to get better position, before next session. (Curtin)+  *  Correlate Boolardy geodetic data to get better position, before next session. (Curtin) ​ ** - in queue **
  
-  *  Investigate reported intermittent data corruption issue. Check vsib header on a whole session. (Curtin/​Chris)+  *  Investigate reported intermittent data corruption issue. Check vsib header on a whole session. (Curtin/​Chris) ​** - postpone till problem re-occurs and can be investigated **
  
-  *  Continue practice of recording and keeping ~30min of good data from fringe tests, as standard sources of correlation testing. Call by the person doing the RTFC (All)+  *  Continue practice of recording and keeping ~30min of good data from fringe tests, as standard sources of correlation testing. Call by the person doing the RTFC (All) ** - Implemented **
  
  
lbaops/telecon2010july09.1280894301.txt.gz · Last modified: 2015/12/18 16:39 (external edit)