User Tools

Site Tools


lbaops:telecon2010mar02

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
lbaops:telecon2010mar02 [2010/03/18 12:18]
tasso
lbaops:telecon2010mar02 [2010/03/18 12:25]
tasso
Line 45: Line 45:
  
 Only items relevant to the next VLBI session are included here. Only items relevant to the next VLBI session are included here.
 +
 +%red* ALL DONE in time (18/3/2010) **
  
   *  Ensure polarisation setup is the best it can be for all antennas, as V288a is a polarisation observation. (All observatories)   *  Ensure polarisation setup is the best it can be for all antennas, as V288a is a polarisation observation. (All observatories)
lbaops/telecon2010mar02.txt · Last modified: 2015/12/18 16:39 (external edit)