User Tools

Site Tools


lbaops:telecon2010mar02

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

lbaops:telecon2010mar02 [2010/03/18 12:25]
tasso
lbaops:telecon2010mar02 [2015/12/18 16:39]
Line 1: Line 1:
-====== ​ VLBI teleconference,​ 02 March 2010 ====== 
-=====  11.00 Perth, 14.00 Eastern, 16.00 New Zealand ===== 
-N.B. Eastern Australia is in Summer time. 
- 
-Phone: 
- 
-| Vic:|03 9545 8222 | 
-| NSW:|02 9490 8022 | 
-| ACT:|02 6276 6622 | 
-| Qld:|07 3214 2311 | 
-|  WA:|08 6436 8844 | 
-|  SA:|08 8273 8122 | 
-|  NT:|08 8944 8488 | 
-| Tas:|03 6232 5188 | 
-Meeting ID: 9997 
- 
-Chair: Tasso Tzioumis 
- 
-Attendance: Shinji Horiuchi (SDCCC, Canberra); ​ Claire Hotan, Aquib Moin, Cormac Reynolds, Hayley Bignall (Curtin); Tasso Tzioumis, Chris Phillips, Shaun Amy (ATNF Marsfield); ​ Jamie Stevens (ATNF, Narrabri); Jim Lovell(UTas,​Hobart);​ Richard Dodson, Maria Rioja (UWA) 
- 
-**Agenda** 
- 
-  *  Issues for March 2010 session 
-    *  Scheduling issues 
-    *  Wiki 
-    *  Disks 
-    *  Observing support 
-    *  Observing software (cdisko) 
-    *  eVLBI issues 
- 
-  *  General Issues 
-    *  ASKAP/NZ VLBI in April 
-    *  Report from Hobart and NZ meetings 
- 
-  *  ACTION items 
-Ongoing action items list at [[lbaops:​telecon2009dec02| Actions from last meeting 2009Dec02]] 
-and 
-[[lbaops:​telecon2009dec16| Actions from last meeting 2009Dec16]] 
- 
-  * AOB 
- 
-**Actions arising**  ​ 
- 
-** NO revision of previous action items was done at this telecon. Postponed for a future telecon. ** 
- 
-Only items relevant to the next VLBI session are included here. 
- 
-%red* ALL DONE in time (18/3/2010) ** 
- 
-  *  Ensure polarisation setup is the best it can be for all antennas, as V288a is a polarisation observation. (All observatories) 
- 
-  *  Ensure all schedules are in and checked. All there at this time except V271e (Cormac) 
- 
-  *  Mk5 disks are needed for Hobart. To be shipped from Parkes. (Chris) 
- 
-  *  Include Tid in the V252p schedules. 
- 
-  *  Ensure disk storage adequate. Only shipping needed is to Ceduna (Claire) 
- 
-  *  Setup Tid XRAID. Remotely done by Chris? 
- 
-  *  Include Mk5 data into copying to Petabyte store for backup. 
- 
-  *  Check whether all Parkes receiver changes are done at the start of the run or during. (Tasso) 
- 
-  *  Get copy of Rb-clock test data to Cormac. (Chris). 
- 
- 
-Next meeting: Post-session debrief, week 15-19 March? 
  
lbaops/telecon2010mar02.txt · Last modified: 2015/12/18 16:39 (external edit)