User Tools

Site Tools


lbaops:telecon2010mar02

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:telecon2010mar02 [2010/03/18 12:18]
tasso
lbaops:telecon2010mar02 [2015/12/18 16:39] (current)
Line 45: Line 45:
  
 Only items relevant to the next VLBI session are included here. Only items relevant to the next VLBI session are included here.
 +
  
   *  Ensure polarisation setup is the best it can be for all antennas, as V288a is a polarisation observation. (All observatories)   *  Ensure polarisation setup is the best it can be for all antennas, as V288a is a polarisation observation. (All observatories)
Line 63: Line 64:
  
   *  Get copy of Rb-clock test data to Cormac. (Chris).   *  Get copy of Rb-clock test data to Cormac. (Chris).
 +
 +** ALL DONE in time (18/3/2010) **
  
  
 Next meeting: Post-session debrief, week 15-19 March? Next meeting: Post-session debrief, week 15-19 March?
  
lbaops/telecon2010mar02.1268875128.txt.gz · Last modified: 2015/12/18 16:39 (external edit)