User Tools

Site Tools


lbaops:telecon2010mar02

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:telecon2010mar02 [2010/03/18 12:07]
tasso
lbaops:telecon2010mar02 [2015/12/18 16:39] (current)
Line 42: Line 42:
 **Actions arising**   **Actions arising**  
  
 +** NO revision of previous action items was done at this telecon. Postponed for a future telecon. **
  
 +Only items relevant to the next VLBI session are included here.
 +
 +
 +  *  Ensure polarisation setup is the best it can be for all antennas, as V288a is a polarisation observation. (All observatories)
 +
 +  *  Ensure all schedules are in and checked. All there at this time except V271e (Cormac)
 +
 +  *  Mk5 disks are needed for Hobart. To be shipped from Parkes. (Chris)
 +
 +  *  Include Tid in the V252p schedules.
 +
 +  *  Ensure disk storage adequate. Only shipping needed is to Ceduna (Claire)
 +
 +  *  Setup Tid XRAID. Remotely done by Chris?
 +
 +  *  Include Mk5 data into copying to Petabyte store for backup.
 +
 +  *  Check whether all Parkes receiver changes are done at the start of the run or during. (Tasso)
 +
 +  *  Get copy of Rb-clock test data to Cormac. (Chris).
 +
 +** ALL DONE in time (18/3/2010) **
 +
 +
 +Next meeting: Post-session debrief, week 15-19 March?
  
-Next meeting: ?? 
lbaops/telecon2010mar02.1268874471.txt.gz · Last modified: 2015/12/18 16:39 (external edit)