User Tools

Site Tools


lbaops:telecon2011dec13

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
lbaops:telecon2011dec13 [2011/12/13 13:59]
chris.phillips
lbaops:telecon2011dec13 [2011/12/19 16:21]
tasso
Line 16: Line 16:
 Chair: Tasso Tzioumis Chair: Tasso Tzioumis
  
-Attendance: +Attendance: Cormac Reynolds, Hayley Bignall, John Morgan (Curtin); Shaun Amy, Tasso Tzioumis, Chris Phillips, Phil Edwards (CASS Marsfield); Simon Ellingsen, Jim Lovell (UTas); Jamie Stevens (CASS Narrabri); Richard Dodson (UWA)
  
 Apologies:  Apologies: 
Line 54: Line 54:
     *  Next DIFX Developers Meeting     *  Next DIFX Developers Meeting
     *  Mixed Band Testing     *  Mixed Band Testing
 +    *  Report form eVLBI workshop in South Africa
 +    *  News from AuScope
 +    *  LBA monitoring issues
 +    *  Cd Mk5C + dBBC
  
  
 **Actions arising** **Actions arising**
 +
 +CARRIED FORWARD/UPDATED
 +  *  Consolidation of the LBA Archive to include all ATNF + Swinburne + Curtin correlated LBA data. Should also add in eVLBI output data. Maintain complete archives at Curtin and ATNF (ATNF/Curtin)
 +    *  ATNF to develop online access to this archive (ATNF) ** - Continuing **
 +    *  ** Arrange ATOA on-line access to archive (ATNF) **
 +  *  Copy LBA data archive from Curtin to ATNF (Curtin, Chris) ** continuing **
 +  *  Transfer of LBA archive from Curtin to ATNF needs route. Firewall issues? (Chris, Shaun)
 +
 +  *  Guidelines for phasing the atca more often during vlbi observations (ATNF) - ** to be revisited **
 +    *  Try automatic pcal via schedules on atca (Jamie S)
 +
 +  *  Implement upgrade for programmable cable changes on VLBI DAS.  (Chris, Jamie S) ** continuing **
 +    *  Contact Peter Mirtchin re DAS remote cabling changes via VSIC (Tasso)
 +
 +  *  Update Parkes VLBI notes on Wiki (Jamie, JER, Tasso)
 +    *  Mk5 notes for Parkes on Wiki (Chris, JER, Tasso)
 +    *  Parkes Calibration notes (JER, Ettore)
 +
 +  *  Investigate/implement mixed mode correlation (64 MHz & 4 x 16 MHz) at Curtin correlator (Cormac, Chris) ** continuing **
 +
 +  *  Proposal for VLBI with GMRT for next round (All) ** continuing **
 +
 +  *  Need to train observers for all antennas as more remote observing is anticipated (Tasso) ** continuing **
 +
 +  *  Organise e-VLBI demo with Brazil (Tasso)
 +  *  eVLBI demo to Korea at K-band (Chris)
 +
 +  *  LBA monitoring problems due to ares issues at UTas (Jamie M) ** continuing
 +    *  Need to find alternative access.
 +
 +NEW ACTION ITEMS
 +
 +  *  Ceduna issues persisting. (UTas)
 +    *  Evaluate results of test with Rb vs H-maser at S-band during LBA session (UTas, CASS, Curtin)
 +
 +  *  Check with NZ re issues with Ww drivs (Tasso)
 +
 +  *  Implement larger filesizes for recording (1 minute) since number of files is impacting the PB store (Chris, Jamie)
 +
 +  *  Need correlator report on telescope performances before March session (Curtin)
 +
 +  *  Need ASKAP data from Nov session. Disk needs to be sent to MRO and data copied (Tasso, Chris)
 +
 +  *  Investigate Rx for Methanol at ASKAP. Very desirable and usable. (Tasso)
 +
 +  *  Check and delete old VTxxx data at Mp and At (Chris)
 +
 +  *  Check if UTas has full 10G connection to campus (Simon)
 +
 +  *  Progress GMRT vlbi tests (ATNF, Curtin)
 +
 +  *  Graham Jenkins is leaving VPAK. need to make new arrangements. Check with VPAK systems manager Craig West (Tasso)
 +
 +  *  Check with AARNet re network access to MRO for March (Tasso)
 +
 +  *  Next LBA annual operations meeting in Marsfield on 21-22 Feb 2012 for full 2 days. To include networking session and VLBA 1/2 day (Tasso)
 +    *  need text re VLBA discussion (Cormac)
 +    *  Check with Phil Diamond and Steven Tingay re VLBA access (Tasso)
 +
 +  *  Test new DiFX fixes for mixed-band mode. (Cormac)
 +
 +  *  Participate in doodle poll for next DiFX meeting. Sydney? (all)
 +
 +  *  Comments on LBA monitoring to Jamie (all)
 +
 +  *  Auto pcal tests on ATCA (Jamie)
 +  *  test time for K-band tied-array phase tests at ATCA (Jamie, Richard)
 +
 +  *  Remind Shaun re extra disks for LBA archive. (Tasso)
 +
 +
 +
 +Next meeting: LBA operations meeting. 21-22 February 2012. CASS at Sydney.
 +
lbaops/telecon2011dec13.txt · Last modified: 2015/12/18 16:39 (external edit)