 Chair: Tasso Tzioumis Chair: Tasso Tzioumis
  
-Attendance: ​ Cormac Reynolds, Hayley Bignall (Curtin); Tasso Tzioumis, Chris Phillips, Phil Edwards, Shaun Amy, John Reynolds (ATNF Marsfield); ​  Jamie McCallum, Simon Ellingsen(UTas);​ Sergei Gulyaev, Tim Natish, Stuart Weston (AUT, NZ) +Attendance: ​ Cormac Reynolds, Hayley Bignall (Curtin); Tasso Tzioumis, Chris Phillips, Phil Edwards, Shaun Amy, John Reynolds (ATNF Marsfield); ​  Jamie McCallum, Simon Ellingsen(UTas);​ Sergei Gulyaev, Tim Natush, Stuart Weston (AUT, NZ) 
  
 Apologies: Jonathan Quick (Hart); Jim Lovell (UTas); Steven Tingay (Curtin) Apologies: Jonathan Quick (Hart); Jim Lovell (UTas); Steven Tingay (Curtin)
Line 60: Line 60:
     *  ** Arrange ATOA on-line access to archive (ATNF) **     *  ** Arrange ATOA on-line access to archive (ATNF) **
  
-  *  Implement Mk5b eVLBI operation (Chris) -** continuing ​**+  *  Implement Mk5b eVLBI operation (Chris) -** Done **
  
   *  Guidelines for phasing the atca more often during vlbi observations (ATNF) - ** to be revisited **   *  Guidelines for phasing the atca more often during vlbi observations (ATNF) - ** to be revisited **
Line 72: Line 72:
 NEW ACTION ITEMS NEW ACTION ITEMS
  
-  *  Consider L-Band operation at Ww with old feed (Tim)+  *  Consider L-Band operation at Ww with old feed (Tim) **  completed **
  
-  *  Investigate/​implement mixed mode correlation (64 MHz & 4 x 16 MHz) at Curtin correlator (Cormac, Chris)+  *  Investigate/​implement mixed mode correlation (64 MHz & 4 x 16 MHz) at Curtin correlator (Cormac, Chris) ​** continuing **
  
-  *  MK5 upgrade for e-VLBI in NZ (Stuart, Chris)+  *  MK5 upgrade for e-VLBI in NZ (Stuart, Chris) ​ ** Done **
  
-  *  Proposal for VLBI with GMRT for next round (All)+  *  Proposal for VLBI with GMRT for next round (All) ** continuing **
  
-  *  Follow-up of zoom-modes for VLBI on atca (Jamie, Tasso)+  *  Follow-up of zoom-modes for VLBI on atca (Jamie, Tasso) ​** Continuing **
   *  Feed-back on tied-array operation (correlator)   *  Feed-back on tied-array operation (correlator)
  
   *  Report on possible persistent frequency problem at Cd (correlator)   *  Report on possible persistent frequency problem at Cd (correlator)
  
-  *  MK5 obsrvation issues:+  *  MK5 obsrvation issues: ​** COMPLETED **
     *  Disk changes? More than 1 hr lost when 10 TB scheduled (Chris, Cormac)     *  Disk changes? More than 1 hr lost when 10 TB scheduled (Chris, Cormac)
     *  Upgrade of Mk5a on Hobart 26m (Jamie M)     *  Upgrade of Mk5a on Hobart 26m (Jamie M)
     *  V271h data tansfer? (Jamie, Cormac, Chris)     *  V271h data tansfer? (Jamie, Cormac, Chris)
  
-  *  Framework for NZ data transfers. Auto-ftp at NZ and Hobart? (Stuart, Jamie M, Cormac, Chris)+  *  Framework for NZ data transfers. Auto-ftp at NZ and Hobart? (Stuart, Jamie M, Cormac, Chris) ​** implemented **
  
-  *  Inform PIs re 20 sec gaps from sched. Use Wiki + PI letter (Cormac, Chris)+  *  Inform PIs re 20 sec gaps from sched. Use Wiki + PI letter (Cormac, Chris) ​
  
-  *  Plan for VLBI demos with AuScope antennas (UTas)+  *  Plan for VLBI demos with AuScope antennas (UTas) ​** DONE **
  
-  *  Copy LBA data archive from Curtin to ATNF (Curtin, Chris)+  *  Copy LBA data archive from Curtin to ATNF (Curtin, Chris) ​** continuing **
  
  