User Tools

Site Tools


lbaops:telecon2011sep07

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:telecon2011sep07 [2011/09/07 18:01]
tasso
lbaops:telecon2011sep07 [2015/12/18 16:39] (current)
Line 85: Line 85:
   *  Report on possible persistent frequency problem at Cd (correlator)   *  Report on possible persistent frequency problem at Cd (correlator)
  
-  *  Ww issues at X-band such as pointing to be addressed (AUT) +  *  Ww issues at X-band such as pointing to be addressed (AUT) - ** Huge progress ** 
-  *  Get AuScope fix for Elevation encoder drift to NZ and Parkes (Jim)+  *  Get AuScope fix for Elevation encoder drift to NZ and Parkes (Jim) ** done **
  
   *  Try automatic pcal via schedules on atca (Jamie S)   *  Try automatic pcal via schedules on atca (Jamie S)
Line 99: Line 99:
 NEW ACTION ITEMS NEW ACTION ITEMS
  
-  *  Need 1 Gbps access to Mk5b unit at Parkes. (Chris, Shaun)+  *  Need 1 Gbps access to Mk5b unit at Parkes. (Chris, Shaun) ​** done **
  
-  *  Acquire 3 TB portable eSATA disks for vlbi data transfers (e.g. ASKAP) ​ (Tasso, Chris)+  *  Acquire 3 TB portable eSATA disks for vlbi data transfers (e.g. ASKAP) ​ (Tasso, Chris) ​** done **
  
   *  Check Mk4 formatter at Hobart for large (~10 usec) clock jumps on 16 MHz bands (UTas)   *  Check Mk4 formatter at Hobart for large (~10 usec) clock jumps on 16 MHz bands (UTas)
Line 122: Line 122:
  
  
-Next meeting: ​TBD+Next meeting: ​08 November 2011, 13:30 Sydney summer time. 
lbaops/telecon2011sep07.1315382490.txt.gz · Last modified: 2015/12/18 16:39 (external edit)