Line 16: | Line 16: | ||
Chair: Tasso Tzioumis | Chair: Tasso Tzioumis | ||
- | Attendance: | + | Attendance: |
- | Apologies: | + | Apologies: |
**Agenda** | **Agenda** | ||
Line 65: | Line 65: | ||
**Actions arising** | **Actions arising** | ||
- | CARRIED FORWARD/ | + | CARRIED FORWARD/ |
+ | |||
+ | * Consolidation of the LBA Archive to include all ATNF + Swinburne + Curtin correlated LBA data. Should also add in eVLBI output data. Maintain complete archives at Curtin and ATNF (ATNF/ | ||
+ | * ATNF to develop online access to this archive (ATNF) | ||
+ | * Arrange ATOA on-line access to archive (ATNF) | ||
+ | * Copy LBA data archive from Curtin to ATNF (Curtin, Chris) | ||
+ | * Transfer of LBA archive from Curtin to ATNF needs route. Firewall issues? (Chris, Shaun) | ||
+ | * Check with Vince re grid-ftp (Tasso, Chris) | ||
+ | * Push e-VLBI archive to Curtin (Chris) | ||
+ | |||
+ | * Phasing the ATCA often during vlbi observations (ATNF) | ||
+ | * Try automatic pcal via schedules on atca (Jamie S) | ||
+ | * test time for K-band tied-array phase tests at ATCA (Jamie, Richard) | ||
+ | * Implement automatic re-phasing of tied array at ATCA (Jamie, Chris) | ||
+ | * Warn PIs to re-phase array in schedules. Need 2-3 mins (Phil) | ||
+ | |||
+ | * Need to train observers for all antennas as more remote observing is anticipated (Tasso) ** continuing ** | ||
+ | |||
+ | * Investigate Rx for Methanol at ASKAP. Very desirable and usable. (Tasso) | ||
+ | |||
+ | * CABB test version records no Tsys. Need to fix before LBA session. Consult with WEW.(Jamie) | ||
+ | |||
+ | * Brazil e-VLBI (Tasso) | ||
+ | |||
+ | * VPAK transfers. Future? (Tasso) | ||
+ | * Evaluate effort for data Xfers to Petabyte store. Include UTas, NZ and South Africa (Chris, Jamie, Cormac) | ||
+ | |||
+ | * Need RTFC to Tid (Chris, Shinji) | ||
+ | * Train Shinji? (Chris) | ||
+ | |||
+ | * For Mk5 observations at Parkes 2 people are not enough. Need more observers (GA, CASS) | ||
+ | |||
+ | * Storage needs at antennas (ATNF) | ||
+ | |||
+ | * 32 GHz VLBI tests | ||
+ | * Check for frequency offsets at ATCA. Talk to engineers. (Jamie) | ||
+ | * 32 GHz radiator at ATCA? | ||
+ | * testing? | ||
+ | |||
+ | * Check for Cd stability improvements after fixed H-maser. (Bad internal connections? | ||
+ | |||
+ | * Commission Cd L-band system. Underway. | ||
+ | |||
+ | * Mixed mode correlation into RTFC (Cormac, Chris) | ||
+ | |||
+ | * MUST fill in WIKI logs for ALL observations. Lack wastes a lot of time. (All) | ||
NEW ACTION ITEMS | NEW ACTION ITEMS | ||
+ | * Check that schedules have the 8441 MHz centre frequency set at ASKAp | ||
+ | |||
+ | * Schedule more fringe tests at ASKAP to monitor system stability (Tasso) | ||
+ | * Develop procedures for mixed-mode correlation tests (Chris, Cormac) | ||
+ | |||
+ | * L-band tests with Cd for Rx commissioning | ||
+ | * Prepare schedules for possible Friday slots (Chris) | ||
+ | |||
+ | * Develop Java-scripts for rtfc control (Chris, Jamie) | ||
+ | |||
+ | * Check disks for Yd antenna for run (Jamie M) | ||
+ | * Check disks shipped from Curtin to Hobart (Jamie M) | ||
+ | |||
+ | * Develop procedures for phase-tying at the ATCA (Jamie, Chris) | ||
+ | |||
+ | * Tweak Ojha schedules for Mk5 data transfer for rtfc (Cormac, Chris) | ||
+ | |||
+ | * Revised schedules to be circulated (Phil) | ||
+ | |||
+ | * Check new correlator config for VLBI at ATCA (Jamie) | ||
+ | |||
+ | * Check on data transfer issues | ||
+ | * Xfers con trolled from Curtin? (Cormac) | ||
+ | * Communicate with VPAk (Tasso) | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | STANDING ACTION ITEMS | ||
+ | |||
+ | * Participate in DiFX meeting 24-28 September 2012 (All) | ||
+ | * Participation in Haystack e-VLBI workshop 22-24 October (All) | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | Next meeting: TBD (Tuesday 16 October 2012?) | ||
- | Next meeting: TBD |