User Tools

Site Tools


lbaops:telecon2013aug27

VLBI teleconference, Tuesday 27 August 2013

03:30 UT - 11:30 Perth, 13:30 AEST, 15:30 New Zealand

Phone:

Vic:03 9545 8222
NSW:02 9490 8022
ACT:02 6276 6622
Qld:07 3214 2311
WA:08 6436 8844
SA:08 8273 8122
NT:08 8944 8488
Tas:03 6232 5188

Meeting ID: 5876

Chair: Tasso Tzioumis

Attendance: Cormac Reynolds (Curtin); Tasso Tzioumis, Chris Phillips, Phil Edwards, Yiannis Gonidakis (CASS Marsfield); Jamie Stevens (CASS Narrabri); Shinji Horiuchi (ATDSCC); Jamie McCallum, Brett Reid (UTas); Laura(GA); Stuart Weston (AUT, NZ)

Apologies:

Agenda

  • Debrief 14-19 August 2013 LBA session
  • Telescope issues
    • ATNF
    • UTAS & AuScope
    • WW
    • South Africa
    • Tid
  • SOC remote observing
    • ATNF
    • UTas
    • NZ
  • Monitoring
  • Disks
  • Correlator
  • Real-time fringe tests
  • NAPA
  • Tests
    • NTFN testing
    • Xcube testing
    • Other testing
  • Next LBA session(s)
    • 18-26 November 2013?
    • Feb-March 2014
  • Upcoming RadioAstron observations ?
  • Korea VLBI technical meeting 10-12 Oct 2013
    • Attendance
    • Presentations
  • DiFX technical meeting 14-18 Oct, Korea
  • e-VLBI developments/demos
  • Future plans: LBA wide-banding?
    • Xcube tests
    • telescope issues
    • correlator issues
    • e-VLBI
  • Location of next Ops meeting??
  • Organise scientific meeting in Northern Territory in 2014?
  • AOB

Actions arising

CARRIED FORWARD/UPDATED/CONTINUING

  • LBA data archive consolidation and copy at CASS. (CASS, Curtin)
    • LBA data archive. Need ATNF disk space (Tasso, Shaun) Continuing
  • ATCA phasing. Check performance and implementation (Jamie S, Richard) Updated
    • Definitely need >200 mJy calibrators. Stress in documentation. (ATNF)
    • Ask PIs to nominate phase-cals and check fluxes BEFORE scheduled observations (Phil, Jasmie S)
  • ATCA Tsys via CABB (CASS) Updated
    • Investigate implementation by Bob Sault (Tasso)
    • Consult with Carrad and Sault about Tsys implementation on the CABB (Tasso)
    • Check with WEW and test whether acal scale preserved when mode changed to VLBI (Jamie S)
  • Observer training and remote observing (Tasso) Continuing
  • Wiki logs (All) Continuing
    • Log transfers quickly to FTP area and/or Wiki (ALL) Continuing
    • Annual “best” wiki-log competition. To be judged by correlator at annual Ops meeting. (Cormac)
  • Schedule more 32 GHz tests with ATCA? (Phil) Continuing
  • Pawsey centre access for VLBI and eVLBI (Chris, Cormac) Continuing
  • Linear to Circular polarisation conversion. (Chris, Richard, Cormac) Continuing
  • Monitoring “check-list” for ATNF telescopes (Chris, Jamie S) Continuing
  • Check-list for ASKAP Rx changes. Especially 100 MHz reference for X-band. (Tasso, Suzy). Continuing
    • Include on Wiki documentation (Tasso)
  • For ATCA include in Wiki log: ref ant, pad, tied-array. Default ant03 on W104. (Jamie S)
  • For Tid, determine which antenna is scheduled in block-schedule and modify setup files (Cormac, Shinji, Phil)
  • Xcube developments and report in Korea meeting (Xcube, Tasso, Chris) Updated
  • Implement “intents” keyword from Vex schedule into ATNF schedules for auto-phasing (Jamie, Chris) Continuing
  • Arrange tests on Curtin Xcube (Chris, Cormac) Continuing
  • Onsource info from ATCA. Fix cgi scripts (Chris) Continuing
  • Investigate desirability of upgrade NZ connection from 1 Gbps to 10 Gbps (All) Continuing

NEW ACTION ITEMS

  • Investigate remote resets on PMON at ATCA? Now need DA (Phil, Jamie)
  • DA role during LBA sessions (Phil, Tasso, Jamie S)
  • Check Mp at 22 and 32 GHz for coherence and fringes (Chris, Jamie S, Tasso, Phil)
  • Procedures for raising Ho observers on Skype. Telephone? (UTas)
  • Get Ww FS log comments onto Wiki. Use UTas “floggit” script and automate? (Stuart, Chris, Jamie M.)
  • Need VSIC remote switch for Tid to avoid cable problems. Check at ATNF (Chris, Jamie S., Tasso)
  • Trial Ke and Yg remote monitoring. Check network loading (Jamie & Jamie)
  • Spare 500 GB disks from ATNF to UTas for Xraid rebuilds (Chris, Jamie M.)
  • Keep vc numbering for rtfc but use separate schedules only when necessary (Phil, Cormac)
  • Fix recmon to track correct experiment name, especially due complex recordings for Ellingsen (Chris, Jamie S)
  • List Mk5 rtfc times for each observation from schedules (Cormac, Chris)
  • Prepare for next LBA session on 18-26 November 2013 (All)
  • Arrange support for spacecraft observations on 29 Dec. (ATNF)
  • Prepare for Feb-March 2014 runs around VSOP sessions. 2-3 days every 9 days. 4 runs (21/2, 2/3, 10/3, 17/3) - ALL
  • Prepare for special arrangements to cope with possible PB store relocation and ~6-week break (Cormac, All)

STANDING ACTION ITEMS

  • Next LBA Ops meeting in Feb 2014. Perth? Decide dates and place (Tasso)
  • VLBI science meeting in 2014 at Darwin (?) and setup LOC, SOC (Tasso, Jim)

Next meeting: October-November 2013

lbaops/telecon2013aug27.txt · Last modified: 2015/12/18 16:39 by 127.0.0.1