User Tools

Site Tools


lbaops:telecon2013jun24

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lbaops:telecon2013jun24 [2013/06/24 15:37]
tasso
lbaops:telecon2013jun24 [2015/12/18 16:39] (current)
Line 77: Line 77:
     *  Definitely need >200 mJy calibrators. Stress in documentation. (ATNF)     *  Definitely need >200 mJy calibrators. Stress in documentation. (ATNF)
     *  Recommend strong calibrators >> 200 Mjy ~every hour (depends on weather) + possible weaker calibrators more often (ATNF)     *  Recommend strong calibrators >> 200 Mjy ~every hour (depends on weather) + possible weaker calibrators more often (ATNF)
-    *  Ask PIs to nominate phase-cals and check fluxes ​BRFORE ​scheduled observations (Phil, Jasmie S)+    *  Ask PIs to nominate phase-cals and check fluxes ​BEFORE ​scheduled observations (Phil, Jasmie S)
  
   *  ATCA Tsys via CABB (CASS) ** Updated **   *  ATCA Tsys via CABB (CASS) ** Updated **
Line 83: Line 83:
     *  Consult with Carrad and Sault about Tsys implementation on the CABB (Tasso) ​     *  Consult with Carrad and Sault about Tsys implementation on the CABB (Tasso) ​
     *  Check with WEW and test whether acal scale preserved when mode changed to VLBI (Jamie S)     *  Check with WEW and test whether acal scale preserved when mode changed to VLBI (Jamie S)
-    *  Review ATCA VLBI configs (Jamie S, Tasso)+    *  Review ATCA VLBI configs (Jamie S, Tasso) ​** Done **
  
   *  Observer training and remote observing (Tasso) ** Continuing **   *  Observer training and remote observing (Tasso) ** Continuing **
Line 115: Line 115:
  
   *  NEXPReS BoD tests and demo would need time around June 2013 (Tasso, Phil) ** Updated **   *  NEXPReS BoD tests and demo would need time around June 2013 (Tasso, Phil) ** Updated **
-    *  BoD test. Scheduled for 27 June 2013(Chris, Tasso)+    *  BoD test. Scheduled for 27 June 2013(Chris, Tasso) ​** Done **
  
   *  Check-list for ASKAP Rx changes. Especially 100 MHz reference for X-band. (Tasso, Suzy).   *  Check-list for ASKAP Rx changes. Especially 100 MHz reference for X-band. (Tasso, Suzy).
-    *  Include on Wikim documentation (Tasso)+    *  Include on Wiki documentation (Tasso)
  
   *  RTFC needs >0.5 hours for Mk5 and complex (e.g Simon'​s) setups (Phil)   *  RTFC needs >0.5 hours for Mk5 and complex (e.g Simon'​s) setups (Phil)
Line 128: Line 128:
     *  Ask Roopesh for calibrator update at 8 and 22 GHz (Chris)     *  Ask Roopesh for calibrator update at 8 and 22 GHz (Chris)
  
-  *  X-raid disks failing e.g at Ceduna. Manage at correlator (Cormac, Hayley)+  *  X-raid disks failing e.g at Ceduna. Manage at correlator (Cormac, Hayley)** Done **
     *  Sent to correlator for replacement of disk (UTas)     *  Sent to correlator for replacement of disk (UTas)
     *  Curtin to keep stock of 750 GB disks (from failing set)  (Cormac)     *  Curtin to keep stock of 750 GB disks (from failing set)  (Cormac)
     *  Curtin has stock of 500 GB spare disks. ATNF also has spares and can provide extras.     *  Curtin has stock of 500 GB spare disks. ATNF also has spares and can provide extras.
  
-  *  NZ slow transfer issues+  *  NZ slow transfer issues ​ ** Resolved **
     *  Possible cache size in Mk5 sofware. Email to Stuart, Chris, Cormac (Jamie M)     *  Possible cache size in Mk5 sofware. Email to Stuart, Chris, Cormac (Jamie M)
  
-  *  No phase-cal extraction from Mk5 in LBA corrlator. Inform Hart. (Tasso)+  *  No phase-cal extraction from Mk5 in LBA corrlator. Inform Hart. (Tasso) ​** Done **
  
-  *  Include Hart 15m availability in LBA. Already in SCHED.+  *  Include Hart 15m availability in LBA. Already in SCHED. ​ ** Done **
     *  Include in OPAL     *  Include in OPAL
     *  Supply web link     *  Supply web link
Line 146: Line 146:
   *  For ATCA include in Wiki log: ref ant, pad, tied-array. Default ant03 on W104. (Jamie S)   *  For ATCA include in Wiki log: ref ant, pad, tied-array. Default ant03 on W104. (Jamie S)
  
-  *  Develop LBA 64 MHz setups for X and K bands (Cormac)+  *  Develop LBA 64 MHz setups for X and K bands (Cormac) ​** Done **
  
   *  For Tid, determine which antenna is scheduled in block-schedule and modify setup files (Cormac, Shinji, Phil)   *  For Tid, determine which antenna is scheduled in block-schedule and modify setup files (Cormac, Shinji, Phil)
  
-  *  Allow cdisko/​server to select 1 x 64 MHz channel (Jamie S)+  *  Allow cdisko/​server to select 1 x 64 MHz channel (Jamie S) ** Done **
  
-  *  KVN test data to Richard Dodson (Chris)+  *  KVN test data to Richard Dodson (Chris) ​** Done **
  
   *  Xcube developments by August session (Xcube, Tasso, Chris)   *  Xcube developments by August session (Xcube, Tasso, Chris)
Line 164: Line 164:
  
  
-Next meeting: ​Early August 2013+Next meeting: ​09 August 2013 
lbaops/telecon2013jun24.1372052254.txt.gz · Last modified: 2015/12/18 16:39 (external edit)