This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
lbaops:telecon2013jun24 [2013/06/21 16:39] tasso |
lbaops:telecon2013jun24 [2015/12/18 16:39] (current) |
||
---|---|---|---|
Line 1: | Line 1: | ||
+ | ====== | ||
+ | ===== 02:00 UT - 10:00 Perth, 12:00 AEST, 14:00 New Zealand | ||
+ | |||
+ | Phone: | ||
+ | |||
+ | | Vic:|03 9545 8222 | | ||
+ | | NSW:|02 9490 8022 | | ||
+ | | ACT:|02 6276 6622 | | ||
+ | | Qld:|07 3214 2311 | | ||
+ | | WA:|08 6436 8844 | | ||
+ | | SA:|08 8273 8122 | | ||
+ | | NT:|08 8944 8488 | | ||
+ | | Tas:|03 6232 5188 | | ||
+ | Meeting ID: 1886 | ||
+ | |||
+ | Chair: Tasso Tzioumis | ||
+ | |||
+ | Attendance: Cormac Reynolds, Hayley Bignall (Curtin); Tasso Tzioumis, Chris Phillips, Phil Edwards, Yiannis Gonidakis, John Reynolds (CASS Marsfield); Jamie Stevens (CASS Narrabri); Jamie McCallum (UTas); | ||
+ | | ||
+ | |||
+ | Apologies: Jonathan Quick (Hart) [Written report supplied] | ||
+ | |||
+ | **Agenda** | ||
+ | |||
+ | * Debrief from last LBA session 13-18 June 2013 | ||
+ | * Reports from the telescopes | ||
+ | * ATNF | ||
+ | * UTas | ||
+ | * NZ | ||
+ | * Hart | ||
+ | |||
+ | * Rtfc and correlation | ||
+ | |||
+ | * ATCA phasing at 22 GHz | ||
+ | |||
+ | * Tests | ||
+ | * With KVN | ||
+ | * NEXPRES & BoD | ||
+ | |||
+ | * Any other issues | ||
+ | |||
+ | * Upcoming observations | ||
+ | * 14-19 August 2013 LBA session | ||
+ | * NTFN testing | ||
+ | * | ||
+ | |||
+ | * Report from Radioastron RISC meeting. | ||
+ | |||
+ | * Wiki logs | ||
+ | |||
+ | * Data transfers. | ||
+ | |||
+ | |||
+ | * e-VLBI developments/ | ||
+ | |||
+ | * Future plans: LBA wide-banding? | ||
+ | * Xcube tests | ||
+ | * telescope issues | ||
+ | * correlator issues | ||
+ | * e-VLBI | ||
+ | |||
+ | * Organise scientific meeting in Northern Territory in 2014? | ||
+ | |||
+ | * Review of [[lbaops: | ||
+ | |||
+ | * AOB | ||
+ | |||
+ | |||
+ | **Actions arising** | ||
+ | |||
+ | CARRIED FORWARD/ | ||
+ | |||
+ | * LBA data archive consolidation and copy at CASS. (CASS, Curtin) | ||
+ | * LBA data archive. Need ATNF disk space (Tasso, Shaun) ** Continuing ** | ||
+ | |||
+ | * ATCA phasing. Check performance and implementation (Jamie S, Richard)** Updated ** | ||
+ | * Definitely need >200 mJy calibrators. Stress in documentation. (ATNF) | ||
+ | * Recommend strong calibrators >> 200 Mjy ~every hour (depends on weather) + possible weaker calibrators more often (ATNF) | ||
+ | * Ask PIs to nominate phase-cals and check fluxes BEFORE scheduled observations (Phil, Jasmie S) | ||
+ | |||
+ | * ATCA Tsys via CABB (CASS) ** Updated ** | ||
+ | * Investigate implementation by Bob Sault (Tasso) | ||
+ | * Consult with Carrad and Sault about Tsys implementation on the CABB (Tasso) | ||
+ | * Check with WEW and test whether acal scale preserved when mode changed to VLBI (Jamie S) | ||
+ | * Review ATCA VLBI configs (Jamie S, Tasso) ** Done ** | ||
+ | |||
+ | * Observer training and remote observing (Tasso) ** Continuing ** | ||
+ | |||
+ | * Wiki logs (All) ** Continuing ** | ||
+ | * Log transfers quickly to FTP area and/or Wiki (ALL) ** Continuing ** | ||
+ | * Annual " | ||
+ | |||
+ | * Schedule more 32 GHz tests with ATCA? (Phil) ** Continuing ** | ||
+ | |||
+ | * Pawsey centre access for VLBI and eVLBI (Chris, Cormac) ** Continuing ** | ||
+ | |||
+ | * Linear to Circular polarisation conversion. (Chris, Richard, Cormac) ** Continuing ** | ||
+ | |||
+ | * Monitoring " | ||
+ | |||
+ | * Monica implementation at Ceduna (Jamie & Jamie) ** Continuing ** | ||
+ | * Remote access to Ceduna VNC via Hobart? (Tasso, Jamie M.) ** Continuing ** | ||
+ | * VNC within VNC ? (Jamie M, Tasso) | ||
+ | |||
+ | * Remote access to Ww (Stuart, Tasso) ** Continuing ** | ||
+ | |||
+ | * Simon Ellingsen complex schedules. Send frequency changes list to Ettore (Parkes) and Quick (Hart) for development of LO setups (Simon, Chris) ** Updated ** | ||
+ | * Rationalise Simon' | ||
+ | |||
+ | |||
+ | |||
+ | NEW ACTION ITEMS | ||
+ | |||
+ | * DASPRO for Parkes needs updating to reflect Mars Rx changes (Chris) | ||
+ | |||
+ | * NEXPReS BoD tests and demo would need time around June 2013 (Tasso, Phil) ** Updated ** | ||
+ | * BoD test. Scheduled for 27 June 2013(Chris, Tasso) ** Done ** | ||
+ | |||
+ | * Check-list for ASKAP Rx changes. Especially 100 MHz reference for X-band. (Tasso, Suzy). | ||
+ | * Include on Wiki documentation (Tasso) | ||
+ | |||
+ | * RTFC needs >0.5 hours for Mk5 and complex (e.g Simon' | ||
+ | |||
+ | * Eliminate separate rtfc schedules except for special mosed (Cormac) | ||
+ | * include in main schedules for 1st hour | ||
+ | * Inform PIs of suitable fringe-finders from block-schedule (Cormac, Chris) | ||
+ | * List of 22 GHz calibrators for Hart (Chris) | ||
+ | * Ask Roopesh for calibrator update at 8 and 22 GHz (Chris) | ||
+ | |||
+ | * X-raid disks failing e.g at Ceduna. Manage at correlator (Cormac, Hayley)** Done ** | ||
+ | * Sent to correlator for replacement of disk (UTas) | ||
+ | * Curtin to keep stock of 750 GB disks (from failing set) (Cormac) | ||
+ | * Curtin has stock of 500 GB spare disks. ATNF also has spares and can provide extras. | ||
+ | |||
+ | * NZ slow transfer issues | ||
+ | * Possible cache size in Mk5 sofware. Email to Stuart, Chris, Cormac (Jamie M) | ||
+ | |||
+ | * No phase-cal extraction from Mk5 in LBA corrlator. Inform Hart. (Tasso) ** Done ** | ||
+ | |||
+ | * Include Hart 15m availability in LBA. Already in SCHED. | ||
+ | * Include in OPAL | ||
+ | * Supply web link | ||
+ | * On wiki documentation | ||
+ | * Inform Leonid Petrov | ||
+ | |||
+ | * For ATCA include in Wiki log: ref ant, pad, tied-array. Default ant03 on W104. (Jamie S) | ||
+ | |||
+ | * Develop LBA 64 MHz setups for X and K bands (Cormac) ** Done ** | ||
+ | |||
+ | * For Tid, determine which antenna is scheduled in block-schedule and modify setup files (Cormac, Shinji, Phil) | ||
+ | |||
+ | * Allow cdisko/ | ||
+ | |||
+ | * KVN test data to Richard Dodson (Chris) ** Done ** | ||
+ | |||
+ | * Xcube developments by August session (Xcube, Tasso, Chris) | ||
+ | |||
+ | |||
+ | |||
+ | STANDING ACTION ITEMS | ||
+ | |||
+ | * VLBI science meeting in 2014 at Darwin (?) and setup LOC, SOC (Tasso) | ||
+ | |||
+ | |||
+ | |||
+ | Next meeting: 09 August 2013 | ||