Line 77: | Line 77: | ||
* Definitely need >200 mJy calibrators. Stress in documentation. (ATNF) | * Definitely need >200 mJy calibrators. Stress in documentation. (ATNF) | ||
* Recommend strong calibrators >> 200 Mjy ~every hour (depends on weather) + possible weaker calibrators more often (ATNF) | * Recommend strong calibrators >> 200 Mjy ~every hour (depends on weather) + possible weaker calibrators more often (ATNF) | ||
- | * Ask PIs to nominate phase-cals and check fluxes | + | * Ask PIs to nominate phase-cals and check fluxes |
* ATCA Tsys via CABB (CASS) ** Updated ** | * ATCA Tsys via CABB (CASS) ** Updated ** | ||
Line 83: | Line 83: | ||
* Consult with Carrad and Sault about Tsys implementation on the CABB (Tasso) | * Consult with Carrad and Sault about Tsys implementation on the CABB (Tasso) | ||
* Check with WEW and test whether acal scale preserved when mode changed to VLBI (Jamie S) | * Check with WEW and test whether acal scale preserved when mode changed to VLBI (Jamie S) | ||
- | * Review ATCA VLBI configs (Jamie S, Tasso) | + | * Review ATCA VLBI configs (Jamie S, Tasso) |
* Observer training and remote observing (Tasso) ** Continuing ** | * Observer training and remote observing (Tasso) ** Continuing ** | ||
Line 115: | Line 115: | ||
* NEXPReS BoD tests and demo would need time around June 2013 (Tasso, Phil) ** Updated ** | * NEXPReS BoD tests and demo would need time around June 2013 (Tasso, Phil) ** Updated ** | ||
- | * BoD test. Scheduled for 27 June 2013(Chris, Tasso) | + | * BoD test. Scheduled for 27 June 2013(Chris, Tasso) |
* Check-list for ASKAP Rx changes. Especially 100 MHz reference for X-band. (Tasso, Suzy). | * Check-list for ASKAP Rx changes. Especially 100 MHz reference for X-band. (Tasso, Suzy). | ||
- | * Include on Wikim documentation (Tasso) | + | * Include on Wiki documentation (Tasso) |
* RTFC needs >0.5 hours for Mk5 and complex (e.g Simon' | * RTFC needs >0.5 hours for Mk5 and complex (e.g Simon' | ||
Line 128: | Line 128: | ||
* Ask Roopesh for calibrator update at 8 and 22 GHz (Chris) | * Ask Roopesh for calibrator update at 8 and 22 GHz (Chris) | ||
- | * X-raid disks failing e.g at Ceduna. Manage at correlator (Cormac, Hayley) | + | * X-raid disks failing e.g at Ceduna. Manage at correlator (Cormac, Hayley)** Done ** |
* Sent to correlator for replacement of disk (UTas) | * Sent to correlator for replacement of disk (UTas) | ||
* Curtin to keep stock of 750 GB disks (from failing set) (Cormac) | * Curtin to keep stock of 750 GB disks (from failing set) (Cormac) | ||
* Curtin has stock of 500 GB spare disks. ATNF also has spares and can provide extras. | * Curtin has stock of 500 GB spare disks. ATNF also has spares and can provide extras. | ||
- | * NZ slow transfer issues | + | * NZ slow transfer issues |
* Possible cache size in Mk5 sofware. Email to Stuart, Chris, Cormac (Jamie M) | * Possible cache size in Mk5 sofware. Email to Stuart, Chris, Cormac (Jamie M) | ||
- | * No phase-cal extraction from Mk5 in LBA corrlator. Inform Hart. (Tasso) | + | * No phase-cal extraction from Mk5 in LBA corrlator. Inform Hart. (Tasso) |
- | * Include Hart 15m availability in LBA. Already in SCHED. | + | * Include Hart 15m availability in LBA. Already in SCHED. |
* Include in OPAL | * Include in OPAL | ||
* Supply web link | * Supply web link | ||
Line 146: | Line 146: | ||
* For ATCA include in Wiki log: ref ant, pad, tied-array. Default ant03 on W104. (Jamie S) | * For ATCA include in Wiki log: ref ant, pad, tied-array. Default ant03 on W104. (Jamie S) | ||
- | * Develop LBA 64 MHz setups for X and K bands (Cormac) | + | * Develop LBA 64 MHz setups for X and K bands (Cormac) |
* For Tid, determine which antenna is scheduled in block-schedule and modify setup files (Cormac, Shinji, Phil) | * For Tid, determine which antenna is scheduled in block-schedule and modify setup files (Cormac, Shinji, Phil) | ||
- | * Allow cdisko/ | + | * Allow cdisko/ |
- | * KVN test data to Richard Dodson (Chris) | + | * KVN test data to Richard Dodson (Chris) |
* Xcube developments by August session (Xcube, Tasso, Chris) | * Xcube developments by August session (Xcube, Tasso, Chris) | ||
Line 164: | Line 164: | ||
- | Next meeting: | + | Next meeting: |