Both sides previous revision Previous revision
lbaops:telecon2013nov08 [2013/11/06 16:45]
tasso
lbaops:telecon2013nov08 [2013/11/08 15:52]
tasso
Line 16: Line 16:
 Chair: Tasso Tzioumis Chair: Tasso Tzioumis
  
-Attendance: ​+Attendance: ​Cormac Reynolds (Curtin); Tasso Tzioumis, Chris Phillips, Phil Edwards, ​ Jamie Stevens (CASS); Shinji Horiuchi (ATDSCC); Jamie McCallum, Brett Reid, Simon Ellingsen (UTas); ​ Oleg Titov(GA)
  
-Apologies: ​+ 
 +Apologies: ​Ioannis Gonidakis
  
 **Agenda** **Agenda**
Line 80: Line 81:
 CARRIED FORWARD/​UPDATED/​CONTINUING CARRIED FORWARD/​UPDATED/​CONTINUING
  
 +  *  LBA data archive consolidation and copy at CASS. (CASS, Curtin)
 +    *  LBA data archive. Need ATNF disk space (Chris,​Tasso,​ Shaun) ** Continuing **
  
 +  *  ATCA phasing. Check performance and implementation (Jamie S, Richard)** Updated **
 +    *  Definitely need >200 mJy calibrators. Stress in documentation. (ATNF)
 +    *  Ask PIs to nominate phase-cals and check fluxes BEFORE scheduled observations (Phil, Jasmie S)
 +    *  Extract phasecals from Vex files and check at ATCA before run (Chris, Jamie S.)
 +
 +  *  ATCA Tsys via CABB (CASS) ** Updated **
 +    *  Consult with Carrad and Sault about Tsys implementation on the CABB (Tasso) ​
 +
 +  *  Observer training and remote observing (Tasso) ** Continuing **
 +
 +  *  Wiki logs (All) ** Continuing **
 +    *  Log transfers quickly to FTP area and/or Wiki (ALL) ** Continuing **
 +    *  Annual "​best"​ wiki-log competition. To be judged by correlator at annual Ops meeting. (Cormac)
 +
 +  *  Pawsey centre access for VLBI and eVLBI (Chris, Cormac) ** Continuing **
 +
 +  *  Linear to Circular polarisation conversion. (Chris, Richard, Cormac) ** Continuing **
 +
 +  *  Monitoring "​check-list"​ for ATNF telescopes (Chris, Jamie S) ** Continuing **
 +
 +  *  For ATCA include in Wiki log: ref ant, pad, tied-array. Default ant03 on W104. (Jamie S, ALL observers)
 +
 +  *  Implement "​intents"​ keyword from Vex schedule into ATNF schedules for auto-phasing (Jamie, Chris) ** Continuing **
 +
 +  *  Curtin Xcube testing. Unit install at ASKAP. (Chris, Cormac, Tasso) ** Continuing **
 +
 +  *  Onsource info from ATCA. Fix cgi scripts (Chris) ** Continuing **
 +
 +  *  DA role during LBA sessions (Phil, Tasso, Jamie S)
 +
 +  *  Procedures for raising Ho observers on Skype. Telephone? (UTas)
 +    *  Implement lists on Skype and/or Wiki for observers(ATNF)
 +
 +  *  Get Ww FS log comments onto Wiki. Use UTas "​floggit"​ script and automate? (Stuart, Chris, Jamie M.)
 +
 +  *  Need VSIC remote switch for Tid to avoid cable problems. ​
 +    *  Cables needed from ATNF (Chris, Jamie S.)
 +
 +  *  Fix recmon to track correct experiment name, especially due complex recordings for Ellingsen (Chris, Jamie S)
 +
 +  *  List Mk5 rtfc times for each observation from schedules (Cormac, Chris)
 +
 +  *  Arrange support for spacecraft observations on 29 Dec. (ATNF)
  
 NEW ACTION ITEMS NEW ACTION ITEMS
  
 +  *  Check disk packs at narrabri and whether more are needed for emergency disk usage (Jamie S, Chris)
 +
 +  *  Check Mp at 22 and 32 GHz for coherence and fringes (Chris, Jamie S, Tasso, Phil)
 +    *  Need Mp visit to setup K-band
 +    *  Check re moisture in mm-Rx window.
 +
 +  *  Encourage and train PIs and CoIs for VLBI observing (Tasso)
 +
 +  *  RadioAstron schedules and check setups (Chris)
 +
 +  *  Mk5C test with Tid (Chris, Shinji)
 +
 +  *  Use new numbers for ATCA (4077 for DA; 4078 for Observer)
  
  
 STANDING ACTION ITEMS STANDING ACTION ITEMS
 +
 +  *  Plan for replacements of old LBA DAS and some failing recorders.
 +    *  Plans to replace at each station (UTas, CASS)
 +
 +  *  Next LBA Ops meeting 11-12 Feb 2014 at Curtin.
 +    *  Draft block program and speakers before Xams (Tasso)
 +    *  Book hotels early. List on Wiki. (ALL)
 +
 +  *  Prepare for Feb-March 2014 runs around VSOP sessions. 2-3 days every 9 days. 4 runs (21/2, 2/3, 10/3, 17/3)  - ALL
 +
 +  *  VLBI science meeting in 2014 at Darwin/​Katherine ​
 +    *  Setup LOC, SOC (Tasso, Jim)
 +
  
  
  
  
-Next meeting: TBD+Next meeting: TBD. After LBA session.