# 2020OCT LBA Block Schedule for the Decemver 2020 Draft Version 1.1 Time-stamp: <2020-12-01 12:00> Basedate 339 Start 2020 0 04:00 Stop 2020 3 24:00 # # # 0.0 30-jul-2020 cjp : planning # 1.0 30-sep-2020 cjp : Initial Release # 1.1 01-dec-2020 cjp : Added fringe check/test ############################################ # # Code Band setup Antennas start UT stop UT Comment/PI # setup/bandw(MHz) # ---- ---------------- ----------------- -------- -------- -------- # vt02av 6.7GHz-2p-4IF AtMpHoCdWa 0 0400 0 1200 Setup v255ak 6.7GHz-2p-4IF AtMpHoCdWa 0 1200 1 0700 Kumar vc391 lba21cm AtMpPaHo 1 0700 1 1500 Check v595a lba21cm-2p-2IF-64MHz AtMpPaHo 1 1500 1 1900 Tranfa v560g lba21cm-2p-4IF AtMpPaHo 1 1900 2 0900 Kirichenko vt28e lba1cm-2p-1IF-64MHz AtMpPaHo 2 0900 2 1600 Phillips v598a lba1cm-2p-1IF-64MHz AtMpPaHo 2 1600 3 0400 McCarthy v587c lba1cm-2p-2IF-64MHz AtMpPaHoHh 3 0400 3 2400 Ramakrishnan