Next: Correlation
Up: Australia Telescope National Facility
Previous: The VLBI scheduler
-
Proposers must coordinate with the non-AT antenna groups for
appropriate programme collaborations where use of non-AT antennas is
proposed. Detailed information and contact persons may be obtained from
the VLBI scheduler.
-
At present, there can be no absentee observing and proposers are
expected to participate in the observing. Personnel requirements can be
quite large i.e. at least 1 person per antenna for each observing shift.
The VLBI scheduler will coordinate the arrangements for observing.
-
Proposing groups must be responsible for their own tape shipments
and correlating arrangements. The VLBI scheduler can provide
information and guidance.
-
The provision of MkIII tapes is the responsibility of the proposer.
S-2 S-VHS tapes are in limited supply and proposers may be required to
provide additional tapes.
-
S-2 and MkIII recording systems are not available at all antennas. Refer to
Table 1 for details on availability.
-
MkII VLBI will no longer be supported on the network and
the MkII recording systems have been removed from most telescopes.
Tasso Tzioumis
Thu Aug 15 12:31:18 EST 1996