S E C T I O N S

C O N T E N T S

 

Surveys
This is where you provide  valuable information on the SKA endeavour to the EMT.

 

Documents
This is your primary access point to EMT reports, SKA technical memos, and the SKA system definition document.

 

Reference Lounge
This is a virtual coffee table covered with links to books, papers, and websites from around the world that will interest people working on the SKA.

Preliminary Program Audit

Preliminary International SKA Engineering &
Management  Team Program Audit

April 2001


General Details

Group name:

 

Host institution:

 

Group leader/coordinator:

 

Group Web site:

 



Present Group Composition (express in calendar year fulltime equivalents - FTE)

Field

Tenured PhD

Postdoc

Postgrad

Graduate

Honours or Undergrad

Support

Other

Astronomy

Engineering

Cross disciplinary

Totals



Budget Estimates ($US, including salaries)

Period

Technical/Scientific

SKA Organisational (inc. national &  international symposia)

Outreach

Other

1995-2000

2001

2002-2005

Totals

Technical Project Areas

Specialisation

FTE (2001)

Brief Description (give project titles &  explain project directions)

Antennas

 

 

RF systems

 

 

Signal transport

 

 

Signal processing (including correlators)

 

 

Interference mitigation

 

 

Array configuration and imaging studies

 

 

SKA system simulation

 

 

Operational software engineering

 

 

Site studies

 

 

Other

 

 



Industry or Commercial Links

Specialisation

Existing or Future

Brief Description (give names of collaborators  where possible and describe direction of future cooperation)

Antennas

 

 

RF systems

 

 

Signal transport

 

 

Signal processing (including correlators)

 

 

Interference mitigation

 

 

Array configuration and imaging studies

 

 

SKA system simulation

 

 

Operational software engineering

 

 

Site studies

 

 

Other

 

 



Collaboration With Other Groups

Specialisation

Existing or Future

Brief Description (give names of collaborators  where possible and describe direction of future cooperation)

Antennas

 

 

RF systems

 

 

Signal transport

 

 

Signal processing (including correlators)

 

 

Interference mitigation

 

 

Array configuration and imaging studies

 

 

SKA system simulation

 

 

Operational software engineering

 

 

Site studies

 

 

Other

 

 



Forthcoming Milestones

Milestone

Date (yyyy/mm/dd)

Type (technical/funding/other)

 


[SKA EMT] [About Us] [Working Groups] [Knowledge Bank] [Timeline] [What's New]

Please contact Aaron Chippendale with questions or comments.