Agenda and supporting documents
9th December 2004
ATUC Open Session
Lecture Theatre, Marsfield
Agenda (v. 30 Nov. 2004)
10:30 – 10:35 | 1. Welcome and introduction | Steven Tingay |
2. Director’s Report | ||
10:35 – 11:05 | 2.1 Director’s response to previous ATUC meeting report | Brian Boyle |
10:35 – 11:05 | 2.2 National/international developments – SKA/xNTD – CSIRO | Brian Boyle |
11:05 – 11:15 | 2.3 Project management update | Dave McConnell |
3. National Facility reports | ||
11:15 – 11:40 | 3.1 ATCA and Mopra 3.1a) 3 mm scheduling 3.1b) 3 mm system status 3.1c) Mopra remote operations | Bob Sault |
11:40 – 12:05 | 3.2 Parkes 3.2a) 50 cm band RFI | John Reynolds |
12:05 – 12:15 | 3.3 Tidbinbilla 3.3a) Spectral line on-the-fly mapping | Jim Lovell |
12:15 – 12:35 | 3.4 LBA 3.4a) eVLBI report | Tasso Tzioumis |
— Lunch — |
13:30 – 13:55 | 3.5 National Facility Office -Electronic submission -On-line archive | Jessica Chapman |
13:55 – 14:15 | 3.6 Application software – SPC/RVS | Neil Killeen |
4. Astrophysics Report | ||
14:15 – 14:40 | 4.1 Science highlights | Lister Staveley-Smith |
14:40 – 15:00 | 4.2 Science case for ATCA 7 mm system | Enno Middelberg |
— Afternoon Tea — |
15:20 – 15:40 | 4.3 CABB user requirements | Jim Caswell |
15:40 – 16:00 | 4.4 xNTD science case | Simon Johnston |
16:00 – 16:20 | 4.5a) Broadband cm receiver upgrade project 4.5b) Broadband cm receiver science case | Naomi McClure-Griffiths |
5. Technology development report | ||
16:20 – 16:45 | 5.1 Current projects – 3mm system (Mopra) – CABB – Methanol Multibeam – MMIC – SKA site testing | Warwick Wilson |
16:45 – 17:05 | 5.2 NTD | Colin Jacka |
10th December 2004
ATUC Closed Session
Page recreated by John Reynolds, Sep 2025