New LBA schedule (V1.8)
- Contemporary messages sorted: [ by date ] [ by thread ] [ by subject ] [ by author ] [ by messages with attachments ]
From: <Jim.Lovell_at_email.protected>
Date: Tue, 7 Mar 2006 15:46:53 +1100
Hi everyone,
The revised LBA schedule (which Chris alluded to in his last email)
is now on the web. For those of you playing at home, changes from
v1.6 include:
* V184a (K-band) cancelled, replaced with V193a (L-band)
* 3mm test (At-Mp) on day 70
* vt07a experiments have been moved around and vt07a1 has been split
I hope this is the last version.
Cheers,
Jim
Date: Tue, 7 Mar 2006 15:46:53 +1100
Hi everyone,
The revised LBA schedule (which Chris alluded to in his last email)
is now on the web. For those of you playing at home, changes from
v1.6 include:
* V184a (K-band) cancelled, replaced with V193a (L-band)
* 3mm test (At-Mp) on day 70
* vt07a experiments have been moved around and vt07a1 has been split
I hope this is the last version.
Cheers,
Jim
-- Dr Jim Lovell, Jim.Lovell_at_csiro.<!--nospam-->au CSIRO Australia Telescope National Facility Ph: (02) 6125 6715 c/o RSAA, Mt Stromlo Observatory, Fax: (02) 6125 0260 Cotter Road, Weston ACT 2611 Mobile: 0412 127364 Australia http://www.atnf.csiro.au/people/Jim.Lovell At Tidbinbilla Ph (02) 6201 7842 (RA Lab), x7800 (switch), x7940(shift)Received on 2006-03-07 15:47:11