Attached is a first draft of the May schedule. ** Comments by Monday
please **
Please ote the following:
1. All fringe-check experiments now are designated with a vc code. As
these have become standard parts of the observing schedule it seems
to make sense to distinguish them from tests. If anyone objects to
this way of doing things AND has an alternative suggestion, please
let me know.
2. No test time has been allocated, other than the initial network-
wide test at the start. If you'd like time for testing, please let me
know and include time ranges, antennas, band info etc etc.
3. For the curious, the big gaps are due to few schedulable S2
experiments, limited disk capacity and limited Tid availability.
Cheers,
Jim
Received on 2006-03-29 16:07:53
Date: Wed, 29 Mar 2006 17:07:20 +1100
Hi everyone,
Attached is a first draft of the May schedule. ** Comments by Monday
please **
Please ote the following:
1. All fringe-check experiments now are designated with a vc code. As
these have become standard parts of the observing schedule it seems
to make sense to distinguish them from tests. If anyone objects to
this way of doing things AND has an alternative suggestion, please
let me know.
2. No test time has been allocated, other than the initial network-
wide test at the start. If you'd like time for testing, please let me
know and include time ranges, antennas, band info etc etc.
3. For the curious, the big gaps are due to few schedulable S2
experiments, limited disk capacity and limited Tid availability.
Cheers,
Jim
-- Dr Jim Lovell, Jim.Lovell_at_csiro.<!--nospam-->au CSIRO Australia Telescope National Facility Ph: (02) 6125 6715 c/o RSAA, Mt Stromlo Observatory, Fax: (02) 6125 0260 Cotter Road, Weston ACT 2611 Mobile: 0412 127364 Australia http://www.atnf.csiro.au/people/Jim.Lovell At Tidbinbilla Ph (02) 6201 7842 (RA Lab), x7800 (switch), x7940(shift) <div>