Hi Cormac,
Thanks - this will help a lot with running Ceduna.
Cheers,
Jamie
On 14/08/13 12:38, Cormac Reynolds wrote:
> hi Jamie,
>
> I changed the mode for Ceduna to 64 MHz. Other stations are unaffected.
>
> cheers,
> Cormac
>
> On 13 August 2013 18:17, Jamie McCallum <Jamie.McCallum_at_email.protected
>> Hi Cormac,
>> With the v252al schedule, is it possible to amend the setup to use
>> the 64 MHz mode at Ceduna? With the cDisko bug fixed, it would make things
>> much easier if Bev doesn't have to swap out the BG3 cable.
>> Cheers,
>> Jamie
>>
>>
>> On 13/08/13 14:03, Cormac Reynolds wrote:
>>>
>>> hi,
>>>
>>> I fixed the problem with v186c (which also affected v486b and v253c).
>>> It was an error in the SCHED setup file for the Gbps stations. I have
>>> redistributed the schedules, but the changes only affect the ATNF
>>> stations.
>>>
>>> cheers,
>>> Cormac.
>>>
>>> On 13 August 2013 11:47, Cormac Reynolds <c.reynolds_at_email.protected
>>>>
>>>> hi Chris,
>>>>
>>>> I take it you mean v186c? Is it the channel order you are worried
>>>> about (I think the frequencies are o.k., but agree the wiki assigns
>>>> them to the wrong IFPOLs)? That's easily fixed.
>>>>
>>>> cheers,
>>>> Cormac
>>>>
>>>> On 13 August 2013 11:39, <Chris.Phillips_at_email.protected
>>>>>
>>>>> Hi Cormac
>>>>>
>>>>> There is something wrong with the v196c schedule - the wiki pages is not
>>>>> consistent with what is wanted. Mopra and ATCA will record the wrong
>>>>> frequencies I think with the current setup.
>>>>>
>>>>> Chers
>>>>> Chris
>>>>>
>>>>> On 13/08/2013, at 1:32 PM, Cormac Reynolds wrote:
>>>>>
>>>>>> hi all,
>>>>>>
>>>>>> v186c has been distributed now.
>>>>>>
>>>>>> cheers,
>>>>>> Cormac
>>>>>>
>>>>>> On 12 August 2013 19:19, Cormac Reynolds <c.reynolds_at_email.protected
>>>>>> wrote:
>>>>>>>
>>>>>>> hi all,
>>>>>>>
>>>>>>> the schedules for this session are on the wiki and have been
>>>>>>> distributed, except v186c which is being revised and should be
>>>>>>> available tomorrow.
>>>>>>>
>>>>>>> Please note that the user schedules now incorporate the fringe check
>>>>>>> schedules, so start at the time designated for the fringe check. v255t
>>>>>>> also has an accompanying separate fringe check schedule (vc213) to
>>>>>>> test the second mode (I recommend fringe testing on vc213 before
>>>>>>> switching to the main schedule to test the first mode). In other cases
>>>>>>> the fringe check page on the wiki is unfilled.
>>>>>>>
>>>>>>> Also, most of the PIs have used the new 'intents' parameter in SCHED
>>>>>>> to designate suitable fringe finder and ATCA phasing sources. I hope
>>>>>>> this will prove useful for the observers.
>>>>>>>
>>>>>>> regards,
>>>>>>> Cormac.
>>>>>>>
>>>>>>> --
>>>>>>> ----------------------------------------------------
>>>>>>> Cormac Reynolds
>>>>>>> Phone: +61 8 9266 3785
>>>>>>> Fax: +61 8 9266 9110
>>>>>>> email: c.reynolds_at_email.protected
>>>>>>> ----------------------------------------------------
>>>>>>
>>>>>>
>>>>>>
>>>>>>
>>>>>> --
>>>>>> ----------------------------------------------------
>>>>>> Cormac Reynolds
>>>>>> Phone: +61 8 9266 3785
>>>>>> Fax: +61 8 9266 9110
>>>>>> email: c.reynolds_at_email.protected
>>>>>> ----------------------------------------------------
>>>>>
>>>>>
>>>>>
>>>>
>>>>
>>>>
>>>> --
>>>> ----------------------------------------------------
>>>> Cormac Reynolds
>>>> Phone: +61 8 9266 3785
>>>> Fax: +61 8 9266 9110
>>>> email: c.reynolds_at_email.protected
>>>> ----------------------------------------------------
>>>
>>>
>>>
>>>
>>
>
>
>
Received on 2013-08-14 12:47:35
Date: Wed, 14 Aug 2013 12:47:13 +1000
Hi Cormac,
Thanks - this will help a lot with running Ceduna.
Cheers,
Jamie
On 14/08/13 12:38, Cormac Reynolds wrote:
> hi Jamie,
>
> I changed the mode for Ceduna to 64 MHz. Other stations are unaffected.
>
> cheers,
> Cormac
>
> On 13 August 2013 18:17, Jamie McCallum <Jamie.McCallum_at_email.protected
>> Hi Cormac,
>> With the v252al schedule, is it possible to amend the setup to use
>> the 64 MHz mode at Ceduna? With the cDisko bug fixed, it would make things
>> much easier if Bev doesn't have to swap out the BG3 cable.
>> Cheers,
>> Jamie
>>
>>
>> On 13/08/13 14:03, Cormac Reynolds wrote:
>>>
>>> hi,
>>>
>>> I fixed the problem with v186c (which also affected v486b and v253c).
>>> It was an error in the SCHED setup file for the Gbps stations. I have
>>> redistributed the schedules, but the changes only affect the ATNF
>>> stations.
>>>
>>> cheers,
>>> Cormac.
>>>
>>> On 13 August 2013 11:47, Cormac Reynolds <c.reynolds_at_email.protected
>>>>
>>>> hi Chris,
>>>>
>>>> I take it you mean v186c? Is it the channel order you are worried
>>>> about (I think the frequencies are o.k., but agree the wiki assigns
>>>> them to the wrong IFPOLs)? That's easily fixed.
>>>>
>>>> cheers,
>>>> Cormac
>>>>
>>>> On 13 August 2013 11:39, <Chris.Phillips_at_email.protected
>>>>>
>>>>> Hi Cormac
>>>>>
>>>>> There is something wrong with the v196c schedule - the wiki pages is not
>>>>> consistent with what is wanted. Mopra and ATCA will record the wrong
>>>>> frequencies I think with the current setup.
>>>>>
>>>>> Chers
>>>>> Chris
>>>>>
>>>>> On 13/08/2013, at 1:32 PM, Cormac Reynolds wrote:
>>>>>
>>>>>> hi all,
>>>>>>
>>>>>> v186c has been distributed now.
>>>>>>
>>>>>> cheers,
>>>>>> Cormac
>>>>>>
>>>>>> On 12 August 2013 19:19, Cormac Reynolds <c.reynolds_at_email.protected
>>>>>> wrote:
>>>>>>>
>>>>>>> hi all,
>>>>>>>
>>>>>>> the schedules for this session are on the wiki and have been
>>>>>>> distributed, except v186c which is being revised and should be
>>>>>>> available tomorrow.
>>>>>>>
>>>>>>> Please note that the user schedules now incorporate the fringe check
>>>>>>> schedules, so start at the time designated for the fringe check. v255t
>>>>>>> also has an accompanying separate fringe check schedule (vc213) to
>>>>>>> test the second mode (I recommend fringe testing on vc213 before
>>>>>>> switching to the main schedule to test the first mode). In other cases
>>>>>>> the fringe check page on the wiki is unfilled.
>>>>>>>
>>>>>>> Also, most of the PIs have used the new 'intents' parameter in SCHED
>>>>>>> to designate suitable fringe finder and ATCA phasing sources. I hope
>>>>>>> this will prove useful for the observers.
>>>>>>>
>>>>>>> regards,
>>>>>>> Cormac.
>>>>>>>
>>>>>>> --
>>>>>>> ----------------------------------------------------
>>>>>>> Cormac Reynolds
>>>>>>> Phone: +61 8 9266 3785
>>>>>>> Fax: +61 8 9266 9110
>>>>>>> email: c.reynolds_at_email.protected
>>>>>>> ----------------------------------------------------
>>>>>>
>>>>>>
>>>>>>
>>>>>>
>>>>>> --
>>>>>> ----------------------------------------------------
>>>>>> Cormac Reynolds
>>>>>> Phone: +61 8 9266 3785
>>>>>> Fax: +61 8 9266 9110
>>>>>> email: c.reynolds_at_email.protected
>>>>>> ----------------------------------------------------
>>>>>
>>>>>
>>>>>
>>>>
>>>>
>>>>
>>>> --
>>>> ----------------------------------------------------
>>>> Cormac Reynolds
>>>> Phone: +61 8 9266 3785
>>>> Fax: +61 8 9266 9110
>>>> email: c.reynolds_at_email.protected
>>>> ----------------------------------------------------
>>>
>>>
>>>
>>>
>>
>
>
>
Received on 2013-08-14 12:47:35