This page contains links to a number of ATNF Technical Memos, many dating back to the 1980s and related to planning for the Australia Telescope Compact Array. More recent memos related to eVLBI and the SKA are located at the bottom of the page.
10.1 Systems and Performance
- 10.1/001 – POLARIZATION SYNTHESIS WITH THE AST
- 10.1/002 – WHAT SIZE ANTENNAS FOR THE AST
- 10.1/004 – AST ASTRONOMICAL PROGRAMS FIELD SIZE DISTRIBUTION
- 10.1/005 – AST USAGE
- 10.1/006 – POTENTIAL AST USAGE
- 10.1/007 – A 1-DAY 720m BASELINE MODE FOR THE AST
- 10.1/008 – THE PROPOSED AUSTRALIAN SYNTHESIS TELESCOPE
- 10.1/009 – SCIENTIFIC JUSTIFICATION FOR THE AST
- 10.1/010 – OPERATING MODES FOR THE AST
- 10.1/011 – ASSESSMENT OF POTENTIAL INTERFERENCE FROM MINING OPERATIONS NEAR PARKES
- 10.1/012 – ACTIVITIES OF AST ASTRPHYSICAL SUB-COMMITTEE
- 10.1/013 – ASTROPHYSICAL OBJECTIVES HELD AT CSIRO DIVISION OF RADIOPHYSICS ON TUESDAY 2 FEBRUARY 1982
- 10.1/014 – REMARKS ON IMAGE RECONSTRUCTION FOR THE MEDIUM AND LONG BASELINES IN THE AUSTRALIA TELESCOPE
- 10.1/015 – AUSTRALIA TELESCOPE – SYSTEMS AND PERFORMANCE
- 10.1/016 – SOME POSSIBLE OPERATING SCENARIOS FOR THE AUSTRALIA TELESCOPE
- 10.1/017 – HYDROGEN MASERS OR A SATELLITE LINK
- 10.1/018 – A COMPARISON OF ESTIMATED COSTS FOR THE AT AND THE US VLB ARRAY
- 10.1/020 – PRELIMINARY COST ESTIMATES FOR VLBI IN AUSTRALIA
- 10.1/021 ZOOM ARRAYS (R N Bracewell) 13-oct-1982, formerly ATDOC111
- 10.1/022 – S-N DEGRADATION DUE TO NON-UNIFORM BASELINE DENSITY
- 10.1/026 BACKGROUND CONFUSION & THE A.T. (D L Jauncey) 11-jan-1983
- 10.1/027 REPORT OF A.T. SYSTEM CONCEPT WORKSHOP HELD AT PARKES, 7-9 DECEMBER 1982 (J G Ables R H Frater A G Little J D O’Sullivan C E Jacka P J Napier) 9-dec-1982
- 10.1/028 CONSIDERATIONS FOR SOLAR AND STELLAR OBSERVATIONS WITH THE AUSTRALIA TELESCOPE (G A Dulk) 07-apr-1983
- 10.1/029 AT FREQUENCY BANKS AND PREFERRED FREQUENCIES (R N Manchester) 22-mar-1983
- 10.1/030 CONSIDERATIONS FOR SOLAR AND STELLAR OBSERVATIONS WITH THE AUSTRALIA TELESCOPE (G A Dulk) 28-apr-1983
- 10.1/031 SOME IMPLICATIONS OF SELF CALIBRATION FOR SYNTHESIS ARRAY CONFIGURATIONS (T J Cornwell R D Ekers) apr-1983
- 10.1/032 ON THE USE OF REDUNDANT SPACINGS (J Noordam) 23-aug-1983
- 10.1/033 USE OF REDUNDANCY TO DETERMINE PHASE ERRORS (D Mclean) 2-nov-1983
- 10.1/034 A COMPACT ARRAY CONFIGURATION FOR THE AUSTRALIA TELESCOPE (P Wild) 15-dec-1983
- 10.1/035 FURTHER THOUGHTS ON CHOOSING REDUNDANT ARRAYS (D Mclean) 21-jan-1984
- 10.1/037 AT SYSTEMS DEFINITION (J W Brooks) 10-apr-1984
- 10.1/038 BETTER REDUNDANT CONFIGURATIONS FOR THE AT (D Mclean) 17-apr-1984
- 10.1/039 CALIBRATION OF THE AUSTRALIA TELESCOPE (M Komesaroff) 26-jul-1985
10.3 Receivers, LO Systems, and Data Links
- 10.3/001 PHASE SYNCHRONISATION OF WIDELY-SEPARATED FREQUENCY STANDARDS USING A SATELLITE-LINK (R T Schilizzi M W Sinclair K J Wellington) 12-jul-1982, formerly ATDOC104
- 10.3/002 CONSIDERATIONS FOR DIGITIZING THE IFS AT THE ANTENNAS FOR THE A.T. (P Napier) 22-jul-1982, formerly ATDOC107
- 10.3/003 NON-COSTLY LOCAL OSCILLATOR DISTRIBUTION IN PIPE (R N Bracewell) 13-dec-1982
- 10.3/004 LO PHASE STABILITY, ABSOLUTE POSITION MEASUREMENTS AND LINEAR POLARIZATION – CONSTRAINTS IMPOSED BY THE ATMOSPHERE AND IONOSPHERE (J R Forster) 20-dec-1982
- 10.3/005 OPTICAL FIBRE USAGE IN THE AT: REPORT ON THE SEVENTH AUSTRALIAN WORKSHOP ON OPTICAL COOMUNICATION (K J Wellington M W Sinclair) 12-jan-1983
- 10.3/006 HYDROGEN MASERS OR A SATELLITE LINK? (R T Schilizzi M W Sinclair K J Wellington) 13-jul-1982, formerly ATDOC105
10.4 Correlator Systems
- 10.4/001 PROPOSED AT SPECTRAL-LINE CORRELATION SYSTEM (J L Caswell J R Forster J B Whiteoak)
- 10.4/002 MUST WE RECIRCULATE THE AT CORRELATOR? (J D O’Sullivan) 12-jul-1983
- 10.4/003 REPORT OF THE WORKSHOP ON THE AUSTRALIA TELESCOPE CORRELATOR SYSTEM (J D O’Sullivan) 16-jan-1984
10.5 Computers & Processing
- 10.5/001 SOFTWARE FOR THE AUSTRALIA TELESCOPE PROJECT (R D Ekers) 21-mar-1983
- 10.5/002 REPORT OF THE WORKSHOP ON AUSTRALIA TELESCOPE COMPUTER SYSTEMS (Chair: R.H.Frater) 28-jul-1983
- 10.5/003 COMPUTER NETWORKS (M Ewing) 13-dec-1985
14.4 LO Systems and Data Links (Fibre Optics & Microwave Links)
- 14.4/001 EVALUATION OF MODERN HYDROGEN MASERS (JPL) 01-dec-1982
14.6 Computers & Processing II
- 14.6/001 ACCMAINT (H May) 10-feb-1988
14.7 General
- 14.7/001 CULGOORA WEATHER STATION USER GUIDE (M Kesteven) 27-jan-1987
15.5 Site Development & Construction – Interference Studies
- 15.5/012 SIDING SPRING A.T. INTERFERENCE SURVEY I (R A Kennedy G F Gerrard I McCurley) 24-jun-1983
- 15.5/018 INTERFERENCE SURVEY II RESUME (R A Kennedy) 17-aug-1983
- 15.5/019 SIDING SPRING INTERFERENCE SURVEY I RESUME (R A Kennedy) 15-jun-1983
- 15.5/020 AT INTERFERENCE SURVEY NO 2 (R A Kennedy) 19-jun-1984
- 15.5/022 INTERFERENCE SURVEY III (R A Kennedy J W Brooks) 19-mar-1984
- 15.5/024 INTERFERENCE SURVEY – NO IV (R A Kennedy A G Little M J Kesteven G F Gerard J W Brooks) 06-jul-1984
- 15.5/025 FREQUENCY ALLOCATIONS (ALSO ON AT 15.7.017) (BJR) 28-aug-1984
- 15.5/027 INTERFERENCE SURVEY 5 – TASMANIA (R A Kennedy P Button G Gowland) 26-oct-1984
- 15.5/030 INTERFERENCE SURVEY 6 – DENNING SITE (R A Kennedy M Gray) 30-jan-1985
- 15.5/037 ALLOWABLE LEVELS OF C.W. INTERFERENCE FOR THE AUSTRALIA TELESCOPE (G Nelson R Forster) 20-sep-1985
- 15.5/040 22 KV ELECTRICAL INTERFERENCE AND THE AT (G J Nelson) 21-oct-1985
15.6 Culgoora
- 15.6/001 AT COMPACT ARRAY LINE SURVEY (Parts 1-4 incl.) (R.A. Kennedy) 28-Jun-1984 to 2-May-1985
- 15.6/255 AUSTRALIA TELESCOPE OPERATING INSTRUCTIONS – CULGOORA ANTENNAS (Macdonald Wagner Pty Ltd) 20-may-1987
17.2 Technical Advisory Groups – Configuration Study Group
- 17.2/003 A CONFIGURATION FOR THE AT COMPACT ARRAY (ALSO ON AT 10.1/036) (R N Manchester) 29-feb-1984
- 17.2.1/001 THE OPTIMUM LENGTH OF THE AT SPUR (R Norris) 17-oct-1984
- 17.2.1/002 FURTHER THOUGHTS ON THE LENGTH OF THE AT SPUR (J R Forster) 22-oct-1984
17.3 Long Baseline Array
- 17.3.1/001 OPTIONS FOR THE LBA COMMUNICATION LINKS – A REPORT OF THE LBA WORKING GROUP (R P Norris) 12-oct-1984
- 17.3.1/002 THE FEASIBILITY OF USING TAPE RECORDERS FOR AT LBA DATA TRANSMISSION (R P Norris J A Roberts) 13-aug-1984
- 17.3.1/003 A PROPOSAL FOR TAPE RECORDERS FOR THE AT LBA (R P Norris) 07-mar-1985
- 17.3.1/004 THE VLBA DATA ACQUISITION SYSTEM REPORT AND ITS IMPACT ON THE AT (R P Norris) 31-jul-1985
- 17.3.1/005 WHAT’S SO GREAT ABOUT PHASE STABILITY? (R P Norris) 14-oct-1985
- 17.3.1/006 A LOWER LIMIT TO LBA CLOCK ACCURACY (R P Norris) 14-mar-1986
- 17.3.1/007 VLBA DATA ACQUISITION SYSTEM (GLJ) 26-may-1986
- 17.3.1/008 REPORT OF THE AT LBA WORKSHOP (R P Norris) 29-may-1986
- 17.3.1/009 AD HOC MEETING ON AT LBA (J W Brooks) 04-sep-1986
- 17.3.1/010 MINUTES OF LBA DISCUSSION (J A Roberts) 11-sep-1986
- 17.3.1/011 FRINGE AND DELAY TRACKING AT ANTENNAS WITH INDEPENDENT LOCAL OSCILLATORS (J A Roberts) 25-sep-1986
- 17.3.1/012 MAXIMUM USABLE PHASE RATES ON THE AT (R P Norris) 11-nov-1986
- 17.3.1/013 A LYMAN/AT ANTENNA IN EASTERN AUSTRALIA? (R P Norris) 16-jun-1987
- 17.3.1/014 THE EFFECT ON THE AT OF AN ANTENNA AT ADELAIDE (R P Norris) 20-oct-1987
- 17.3.1/015 THE AT LONG BASELINE ARRAY (R P Norris) 17-feb-1988
- 17.3.1/016 THE EFFECT ON THE AT OF AN ANTENNA AT PERTH (R P Norris) 23-feb-1988
18.2 Working Documents
- 18.2/001 WORKING LIST OF POTENTIAL CALIBRATION SOURCES FOR SOUTHERN HEMISPHERE RADIO OBSERVATIONS (M J Batty) feb-1983
20.1 Overall Systems Performance & Operation – File Notes
- 20.1/004 CONSIDERATIONS ON DIGITAL FILTERS FOR THE AUSTRALIA TELESCOPE (J R Forster) 24-may-1983
- 20.1/005 AT COMPACT ARRAY: EFFECT OF DEVIATIONS FROM A LINEAR EAST-WEST ARRAY (J R Forster J D O’Sullivan R N Manchester) 27-sep-1983
- 20.1/006 WIDE FIELD MAPPING: EFFECTS INCREASING WITH DISTANCE FROM THE FIELD CENTRE (J R Forster) 09-nov-1983
- 20.1/008 THE CHOICE OF INTEGRATION TIME FOR THE AT (R P Norris) 17-feb-1984
- 20.1/009 FURTHER THOUGHTS ON CHOOSING REDUNDANT ARRAYS (D Mclean) 21-jan-1984 (duplicates 10.1/035)
- 20.1/012 THE ASTRONOMICAL POTENTIAL OF THE LBA (R Norris) 16-apr-1984
- 20.1/013 STATUS AND FUTURE OF THE PTI (R P Norris) 21-mar-1986
- 20.1/014 THE SCHEDULING PROBLEM (M J Kesteven) 22-mar-1986
- 20.1/015 SURVEY AND POSITIONING TOLERANCES (M J Kesteven) 01-apr-1986
20.1.1 Overall Systems Performance & Operation – Technical Notes & Reports
- 20.1.1/001 FREQUENCY BANDS FOR THE AT (T M Percival) 05-jun-1984
- 20.1.1/002 A PROPOSAL FOR A PARKES-TIDBINBILLA INTERFEROMETER (R Norris) 15-jun-1984
- 20.1.1/003 THE EFFECT ON THE PERFORMANCE OF THE LBA OF A TELESCOPE AT HOBART (R Norris) 19-jun-1984
- 20.1.1/004 RESULTS FROM QUESTIONNAIRE ON PROJECTED AT USE (R P Norris) 4-aug-1984
- 20.1.1/005 POLARIZATION AND THE AT (M J Kesteven) 30-nov-1984
- 20.1.1/006 OBSERVATIONAL CONSEQUENCES OF LINEARLY POLARIZED FEEDS FOR THE AT (R Forster) 27-nov-1984
- 20.1.1/007 STAND ALONE OPERATION OF THE AT ANTENNAS (J R Forster) 10-dec-1984
- 20.1.1/008 SOME QUESTIONS ON THE OPERATION OF THE AT (R Norris) 01-may-1985
- 20.1.1/009 SCIENTIFIC IMPLICATIONS OF A 16 MHZ XCELL (J R Forster) 13-jun-1985
- 20.1.1/010 ALLOWABLE LEVELS OF C.W. INTERFERENCE FOR THE AUSTRALIA TELESCOPE (G Nelson R Forster) 20-sep-1985
- 20.1.1/011 OPERATION OF THE AUSTRALIA TELESCOPE (J Brooks G Nelson) 25-sep-1985
- 20.1.1/012 PULSAR OBSERVATIONS WITH THE AUSTRALIA TELESCOPE (G J Nelson) 11-jul-1985
- 20.1.1/013 MILLISECOND INTEGRATION TIMES ON THE COMPACT ARRAY (G J Nelson) 11-jul-1985
- 20.1.1/014 BANDWIDTH SYNTHESIS ON THE COMPACT ARRAY (R N Manchester) 01-oct-1985
- 20.1.1/015 REPORT TO THE 11TH MEETING OF THE AT ADVISORY COMMITTEE (G J Nelson) 10-oct-1985
- 20.1.1/016 LEVEL AND GAIN CONTROL IN THE AT (G J Nelson) 06-feb-1986
- 20.1.1/017 A BRIEF LOOK AT AT CALIBRATION (D L Jauncey) 20-feb-1986
- 20.1.1/018 MOLECULAR LINES AND THE AT FREQUENCY BANDS (J R Forster) 25-feb-1986
- 20.1.1/019 COMPUTATIONAL LOAD FOR BANDWIDTH SYSTHESIS (G J Nelson) 05-mar-1986
- 20.1.1/020 SWITCHING WAVEFORMS FOR THE AT RECEIVERS (G J Nelson) 27-mar-1986
- 20.1.1/021 THE PROBLEM OF THE MISSING LOW SPATIAL FREQUENCIES (M Kesteven J Caswell) 15-mar-1986
- 20.1.1/022 SYSTEM DRAWINGS (G Nelson) 23-apr-1986
- 20.1.1/023 REPORT TO THE 12TH MEETING OF THE AT ADVISORY COMMITTEE – SYSTEM OVERVIEW (G J Nelson) 23-apr-1986
- 20.1.1/024 TIMING REQUIREMENTS FOR THE AT DELAY AND FRINGE TRACKING SYSTEM (J R Forster) 6-may-1986
- 20.1.1/025 INTERFEROMETRIC MAPPING USING THE HARTLEY TRANSFORM (R N Bracewell) 21-may-1986
- 20.1.1/026 DIFFERENTIAL DELAYS IN POLARIZERS (G J Nelson) 26-jun-1986
- 20.1.1/027 LABELLING DIGITIZED IF DATA WITH TIME INFORMATION (G J Nelson) 01-aug-1986
- 20.1.1/028 IMPLICATIONS OF INCLUDING THE INTERNATIONALLY PROTECTED BANDS 2690-2700 MHZ AND 10.6 – 10.7 GHZ IN THE AT BANDS (G J Nelson) 22-aug-1986
- 20.1.1/029 LEVEL CONTROL AND TSYS MONITORING IN THE AT (G J Nelson) 23-sep-1986
- 20.1.1/030 INTEGRATION AND CYCLE TIMES IN THE AT (G J Nelson) 24-sep-1986
- 20.1.1/032 DEFINITION OF TERMINOLOGY AND QUANTITIES FOR THE AT (R P Norris) 13-oct-1986
- 20.1.1/033 BANDWIDTH AND MOSAICING SYNTHESIS (R D Ekers) 15-oct-1985
- 20.1.1/034 BANDWIDTH SYNTHESIS AND MOSAICING – CONSTRAINTS ON INTEGRATION TIMES (R N Manchester M J Kesteven) 27-oct-1986
- 20.1.1/042 AT NOMENCLATURE (M Calabretta R Norris) 11-aug-1987
- 20.1.1/047 12 GHZ METHANOL RECEIVERS FOT THE AT (R P Norris) 19-nov-1987
- 20.1.1/051 SYSTEMS OVERVIEW (G J Nelson) 24-feb-1988
20.1.2 System Testing
- 20.1.2/015 THE POLARISATION CHARACTERISTICS OF THE AT ANTENNAS (M Kesteven W Wilson) 03-may-1989
20.2 Internal Memos
- 20.2/001 A WORKING LIST OF POTENTIAL CALIBRATION SOURCES FOR SOUTHERN HEMISPHERE RADIO OBSERVATIONS – SEE 18.2/001
- 20.2/002 HIGH-FREQUENCY SPECTRAL-LINE OBSERVATIONS ON THE AT (J B Whiteoak) 13-apr-1983
20.3 Meetings of Working Group
- 20.3/001 REPORT OF AT SYSTEM CONCEPT WORKSHOP HELD AT PARKES 7-9 DECEMBER 1982 – SEE 10.1.027
20.8 System Definition Documents
- 20.8/009 AT SYSTEMS DEFINITION, VERSION NO. 9 () 21-may-1987
21.1.1 Antenna Systems – File Notes
- 21.1.1/025 POSSIBLE STATION LOCATIONS FOR COMPACT ARRAY (R N Manchester) 28-jun-1983
21.1.1.1 Antenna Systems – Technical Notes & Reports
- 21.1.1.1/009 THERMAL DISTORTION OF THE AT ANTENNAS (M J Kesteven) 29-sep-1987
- 21.1.1.1/010 THERMAL DISTORTIONS II (G Nelson M Kesteven) 17-dec-1987
- 21.1.1.1/011 THERMAL DISTORTION OF THE AT ANTENNAS II (G Nelson M Kesteven) 17-dec-1987
21.3.1.1 Feeds – Technical Notes & Reports
- 21.3.1.1/001 EFFECTS OF AXIAL SUBREFLECTOR SHIFTS ON THE AT (R Kennedy) 16-mar-1984
- 21.3.1.1/004 FEEDS FOR THE AT: THE USE OF LINEAR POLARIZATION AS IT AFFACTS VLBI AND LBA MEASUREMENTS (M Komesaroff) 29-nov-1984
- 21.3.1.1/006 FEED AND RECEIVER CONFIGURATIONS FOR PARKES – FOR LBA AND FOR SINGLE DISH WORK (M Komesaroff) 03-oct-1985
21.4.1.1 Servo Mechanisms – Technical Notes & Reports
- 21.4.1.1/001 PRELIMINARY ERROR BUDGET FOR SERVO SYSTEM (M Beavis R Evans) 20-sep-1984
21.5.1.1 Subreflectors – Technical Notes & Reports
- 21.5.1.1/001 SCIENTIFIC CONSTRAINTS ON THE ALLOWABLE SUBREFLECTOR MOTIONS FOR THE AT ANTENNAS (J R Forster) 29-feb-1984
22.1.1 Receivers – Technical Notes & Reports
- 22.1.1/003 IF CONVERSION AND NARROW-BAND ANALOG FILTERING (G Graves) 30-may-1984
- 22.1.1/004 IF ANALOG FILTERS: THEIR BANDSHAPE (G Graves) 23-oct-1984
- 22.1.1/029 SPURIOUS SIGNALS, COMB LINES AND LOCAL OSCILLATORS (G Graves) 07-apr-1988
23.4 LO Systems
- 23.4/011 A SOFTWARE SOLUTION TO THE LO DOPPLER PROBLEM (R P Norris) 31-jan-1985
23.4.1 LO Systems – Technical Notes & Reports
- 23.4.1/002 COMMUNICATION LINKS FOR THE LBA (A C Young) 10-aug-1984
- 23.4.1/003 PHASE (AND DATA) TRANSFER BY POINT-TO-POINT RADIO LINK (B Anderson) oct-1984
- 23.4.1/004 PHASE TRANSFER VIA AUSSAT (B Anderson) oct-1984
- 23.4.1/006 AT ONE DAY SYMPOSIUM ON DIGITAL VS ANALOGUE FILTERS AND THE IMPLICATIONS ON LO DESIGN (R Gough) 24-may-1984
- 23.4.1/011 A MATTER OF TERMINOLOGY ‘CLOCKS’ AND ‘FREQUENCY STANDARDS’ (J Roberts) 17-apr-1986
- 23.4.1/012 CONTROL INFORMATION FOR THE LO AND CORRELATOR (M Kesteven R P Norris) 23-nov-1986
- 23.4.1/015 LO LINE STABILISATION AND THE INTEGRATION CLOCK (M Kesteven A Young) 24-mar-1987
- 23.4.1/016 DATA TRANSMISSION SYNCHRONISATION (W E Wilson) 18-mar-1987
24.1.1 Correlator Systems – Technical Notes & Reports
- 24.1.1/005 SCIENTIFIC IMPLICATIONS OF A 16 MHZ XCELL – SEE 20.1.1.009
- 24.1.1/010 AT CORRELATOR BLOCK TECHNICAL INFORMATION (D Loone) 27-oct-1986
25.1 Computers & Processing – File Notes
- 25.1/007 COMPUTING REQUIREMENTS FOR AT SOFTWARE DEVELOPMENT (R Wand M Kesteven P Rayner) 24-feb-1984
- 25.1/016 CALIBRATION NOTES II – DELAYS AND PHASES THAT NEED TO BE CALIBRATED (M J Kesteven) 24-apr-1986
- 25.1/017 MONITOR POINTS WHICH PROVIDE CONTROL INFORMATION (M J Kesteven) 24-apr-1986
- 25.1/027 THE SAMPLER SYNCHRONISING CYCLE (M J Kesteven) 25-sep-1986
- 25.1/028 THE AT CLOCK(S) (M J Kesteven) 04-oct-1986
- 25.1/029 OFFLINE COMPUTER SYSTEM FOR THE AT (J E Baldwin W N Brouw R D Ekers) 30-oct-1986
- 25.1/031 THE EMPEE PROGRAM (J D Argyros) 12-jan-1987
- 25.1/035 THE XMNMP PROGRAM (J D Argyros) 06-aug-1987
25.1.1 Computers & Processing – Technical Notes & Reports
- 25.1.1/001 DATA STORAGE AND TRANSPORT REQUIREMENTS FOR THE AT (R Norris) 23-may-1984
- 25.1.1/002 ON LINE AT CORRECTIONS REVISED (M J Kesteven) 26-oct-1984
- 25.1.1/003 A SOURCE CATALOGUE FOR THE AT (R Norris) 17-sep-1984
- 25.1.1/006 THE SCHEDULING PROBLEM PART II (M J Kesteven) 23-oct-1984
- 25.1.1/007 ON-LINE SOFTWARE II (M J Kesteven) 23-oct-1984
- 25.1.1/010 REPORT OF THE DATA PROCESSING MEETING 28 MAY 1984 PART II (M J Kesteven Jrf Rpn Ptr Rhw) 28-may-1984
- 25.1.1/011 SELFCAL AND THE AT (R Norris M Kesteven) 25-nov-1984
- 25.1.1/013 AT/RP COMPUTING IN 1988 AND BEYOND (M J Kesteven) 16-jan-1985
- 25.1.1/021 A UV DATA FORMAT FOR THE AT (R Norris) 08-may-1985
- 25.1.1/024 THE CULGOORA DATA COLLECTION SYSTEM (Rhw) 28-sep-1985
- 25.1.1/025 STEERING THE AT – THE EPHEMERIS ROUTINES (M Kesteven M Calabretta) 05-mar-1986
- 25.1.1/026 OPERATING THE CA AS A TIED ARRAY THE PHASING PROBLEM (M J Kesteven) 22-jan-1986
- 25.1.1/028 DRAFT SPECIFICATION FOR RPFITS (R P Norris) 24-feb-1986
- 25.1.1/029 CALIBRATION NOTES I ANTENNA ERRORS (M J Kesteven Mrc) 17-apr-1986
- 25.1.1/030 IONOSPHERIC CORRECTIONS (M J Kesteven) 31-mar-1986
- 25.1.1/033 THE AT CATALOGUE (R P Norris) 29-sep-1986
- 25.1.1/037 DEFINITION OF TERMINOLOGY AND QUANTITIES FOR THE AT (R P Norris) 13-oct-1986
- 25.1.1/038 AT PROGRAMMING STANDARDS (R P Norris) 19-dec-1986
- 25.1.1/041 MAXIMUM DATA RATES BETWEEN ACC AND DATA SETS (D Ferris) 28-jan-1987
- 25.1.1/043 CONTROL INFORMATION (M J Kesteven) 14-mar-1987
- 25.1.1/044 DATA SET TYPES AND OPTIONS (D Ferris) 26-feb-1987
- 25.1.1/045 PROGRAMMER’S GUIDE TO THE AT DATASET (M Kesteven R Ferris) 22-jan-1987
- 25.1.1/047 DATA PROCESSING FOR THE AUSTRALIAN TELESCOPE (R P Norris) 11-sep-1987
- 25.1.1/050 DATA TRANSFER FOR THE AT (R P Norris) 07-jan-1987
- 25.1.1/051 CALIBRATION OF THE AUSTRALIAN TELESCOPE (R P Norris) 22-feb-1988
27.7 VLBI
- 27.7/002 AN ASIAN/PACIFIC VLBI FACILITY (R P Norris) 15-sep-1987
- 27.7/003 FUTURE DEVELOPMENT OF THE PTI (R P Norris) 25-feb-1988
29.1 QUASAT – File Notes and General
- 29.1/008 QUASAT REPORT ON THE PHASE A STUDY (B Anderson A Van Ardenne A Baudry A Benz R S Booth A Ferrari D W Murphy E Preuss R T Schilizzi G Tofani P N Wilkinson) oct-1988
39.0 AT Operations Files – Technical Documents
- 39.0/001 ATNF DOCUMENTATION (W Walsh) 24-jun-1991
- 39.0/003 CSIRO-DIT COLLABORATION TECHNOLOGY REVIEW (M Lloyd) 23-apr-1993
39.1 AT Manuals
- 39.1/008 PHOENIX SOFTWARE (M Kesteven E Troup) 01-feb-1995
- 39.1/009 PHASE TRANSFER SYSTEM TECHNICAL MANUAL (A Young G Mcculloch M Hayes R Gardyne) 01-apr-1996
- 39.1/010 AUSTRALIA TELESCOPE LOCAL OSCILLATOR SYSTEMS (A C Young) 24-jan-1990
39.2 AT Technical Data
- 39.2/010 MEASUREMENTS OF THE ATCA PRIMARY BEAM (M H Wieringa M J Kesteven) 08-sep-1992
- 39.2/011 TILT RESULTS (I) (H Du M Kesteven) 21-nov-1992
- 39.2/012 TILT RESULTS (II) (H Du M Kesteven) 05-dec-1992
- 39.2/013 INTELLIGENT AT FAULT DIAGNOSIS SYSTEM USERS’ MANUAL (R Landau) 04-may-1993
- 39.2/014 THE AUSTRALIA TELESCOPE DATA ARCHIVING PROBLEM (S W Amy D Mcconnell R M Wark) 28-apr-1993
- 39.2/015 SCHEDULING COMPACT ARRAY CONFIGURATIONS (G Nelson) 02-jun-1993
- 39.2/016 CRYOGENICS MAINTENANCE MANUAL NARRABRI & MOPRA (M Bland) 27-nov-1992
- 39.2/017 WIND TORQUES ON ANTENNAS (Connell Wagner Pty Ltd) 20-apr-1993
- 39.2/018 TRANSIENT RESPONSE OF THE RECEIVER SYSTEM – IMPLICATIONS FOR BANDWIDTH SYNTHESIS (R Gough) 17-aug-1993
- 39.2/019 ARRAY CONFIGURATIONS AND LENGTH OF SCHEDULING PERIOD (G Nelson) 04-nov-1993
- 39.2/020 PHASE JUMPS IN THE AT PHASE ROTATOR MODULES (A Bish) 22-nov-1993
- 39.2/021 MOPRA MEETING MINUTES AND THEIR UPDATE (G Baines) 19-jul-1993
- 39.2/022 RECEIVER SYSTEM TEMPERATURES (R Gough) 19-jan-1994 (duplicates 39.3/034)
- 39.2/024 ATCA RECONFIGURATION CALIBRATION AND IMPLICATIONS FOR NEW CONFIGURATIONS AND STATIONS (D J Mckay) 22-nov-1996
- 39.2/031 THERMAL CONDUCTIVITY CONSIDERATIONS OF STAINLESS STEEL COMPONENTS (B Kingdom) 23-nov-1992
- 39.2/032 INTELLIGENT AT FAULT DIAGNOSIS SYSTEM: REPORT TO DATE (R Landau) 19-nov-1992
- 39.2/033 DATA SET PRODUCTION: THE FINAL RECKONING? (D Ferris) 11-mar-1993
- 39.2/034 AT TECHNICAL REPORT NO. E1: CULGOORA WEATHER STATION (M J Kesteven) 29-jun-1988
- 39.2/035 THE AT MONITORING SYSTEM (M J Kesteven) 26-mar-1990
- 39.2/036 COMPACT ARRAY COMPUTERS AND SOFTWARE (M J Kesteven) 13-oct-1990
- 39.2/037 INTELLIGENT MONITOR SYSTEM FOR THE AUSTRALIA TELESCOPE (M Kesteven) 01-jun-1990
- 39.2/053 VLBI TEST TONE UNIT (R Gough G Herbert) 22-sep-1993
- 39.2/055 INTERFERENCE ON THE COMPACT ARRAY AND SHIELDING RECOMMENDATIONS (R Gough) 22-mar-1994
- 39.2/056 RECEIVER UPGRADE FOR S2 METHANOL VLBI OBSERVATIONS AT 12.2 GHz (R Gough) 28-mar-1994
- 39.2/059 FAULTY: REPORT FROM IJCAI-93 ARTIFICIAL INTELLIGENCE CONFERENCE IN FRANCE (R Landau) 30-aug-1993
- 39.2/060 MOPRA POINTING INTERIM REPORT #1 (M J Kesteven) 22-may-1994
- 39.2/061 MOPRA HOLOGRAPHY INTERIM REPORT #1 (M J Kesteven) 22-may-1994
- 39.2/063 HOT BOX MEASUREMENT OF COMPACT ARRAY RECEIVER SYSTEM TEMPERATURES (R Gough) 22-jul-1994
- 39.2/064 CRYOGENIC PERFORMANCE OF DRP 12 GHz MMIC AMPLIFIER (R Gough) 21-nov-1995
- 39.2/065 ATMOSPHERIC NOISE CONTRIBUTION TO RECEIVER SYSTEM TEMPERATURE AT 35-50 GHZ (R Gough) 05-feb-1996
- 39.2/066 CRYOGENIC PERFORMANCE OF DRP 25-40 GHz MMIC AMPLIFIER (R Gough) 09-mar-1996
- 39.2/067 12 MM RECEIVER FOR SHANGHAI OBSERVATORY (R Gough) 12-apr-1996
- 39.2/068 PERFORMANCE OF THE 12MM RECEIVER ON SHANGHAI 25M RADIOTELESCOPE / SHANGHAI TRIP REPORT (R Gough) 14-may-1996
- 39.2/071 MANUAL NO. K2, ANALYSIS OF AUSTRALIA TELESCOPE COMPACT ARRAY DATA WITH AIPS (N Killeen) 27-nov-1993
- 39.2/072 CRYOGENIC PERFORMANCE OF DRP 1-14 GHz MMIC AMPLIFIER (R Gough) 29-aug-1996
39.3 AT Technical Document Series
- 39.3/001 AT TECHNICAL REPORT NO E1 CULGOORA WEATHER STATION (M J Kesteven) 29-jun-1988
- 39.3/002 THE POLARISATION CHARACTERISTICS OF THE AT ANTENNAS (M Kesteven W Wilson) 03-may-1989
- 39.3/003 THE AT MONITORING SYSTEM (M J Kesteven) 26-mar-1990
- 39.3/004 MILLIMETRE WAVE CAPABILITY FOR THE AUSTRALIAN TELESCOPE: A DISCUSSION DOCUMENT FOR USERS (P Hall) 11-jul-1990
- 39.3/005 COMPACT ARRAY COMPUTERS AND SOFTWARE – SEE 39.2.036
- 39.3/006 EFFECTS OF SHADOWING AT THE AT (R Subrahmanyan) 07-jan-1991
- 39.3/007 SOME SIMULATIONS OF SELF-CALIBRATION FOR THE AT — SEE 39.3.058
- 39.3/008 SOME SIMPLE MOSAICING CALCULATIONS FOR THE AT — SEE 39.3.059
- 39.3/009 LBA – A DISCUSSION DOCUMENT (A Tzioumis) 18-apr-1991
- 39.3/010 SYSTEM TEMPERATURE CALIBRATION OF THE AUSTRALIA TELESCOPE RECEIVER SYSTEMS (M W Sinclair R G Gough) 13-jul-1991
- 39.3/011 THE MONITORING SYSTEM FOR THE AUSTRALIA TELESCOPE (R G Gough M J Kesteven) 12-jul-1991
- 39.3/012 AT PRIMARY BEAM MEASUREMENTS AT 20CM (L Staveley-smith M J Kesteven R Subrahmanyan) 26-jul-1991
- 39.3/013 INITIAL RESULTS OBTAINED WITH THE 30 GHz RADIOMETER (R Gough R K Flavin) 02-sep-1991
- 39.3/014 AUSTRALIA TELESCOPE CORRELATOR COMPUTER UPGRADE (D Loone) 10-sep-1991
- 39.3/015 AT POLARISATION CALIBRATION (R J Sault N E B Killeen M J Kesteven) 19-sep-1991
- 39.3/016 AIPS++ USER SPECIFICATIONS (Atnf Staff And Users) 18-dec-1991
- 39.3/017 INSTALLATION OF A 70-115 GHZ RECEIVER ON THE MOPRA ANTENNA (J M Payne) mar-1992
- 39.3/018 ATNF AIPS++ TECHNICAL SPECIFICATIONS (N Killeen) 01-may-1992
- 39.3/019 MULTI-FREQUENCY SYNTHESIS WITH THE ATCA (R J Sault) 08-may-1992
- 39.3/020 A SURVEY OF THE INTERFERENCE IN THE 13 AND 20CM BANDS AT THE ATCA (M H Wieringa R Subrahmanyan) 18-may-1992
- 39.3/021 REMOTE AND UNATTENDED OBSERVING AT NARRABRI (P Hall) 19-may-1992
- 39.3/022 AIPS++ CONSORTIUM USER SPECIFICATIONS: ATNF PRIORITIES (Atnf Staff And Users) 19-may-1992
- 39.3/023 INTERFERENCE WITHIN THE ANTENNA CONVERSION SYSTEM (G Graves R Gough S Amy M Wieringa) 01-sep-1992
- 39.3/024 MEASUREMENTS OF THE ATCA PRIMARY BEAM (M H Wieringa M J Kesteven) 08-sep-1992
- 39.3/025 AT OPERATION AT MILLIVETRE WAVES: PROGRESS REPORT FOR USERS (P J Hall M H Wieringa D A Abbott D McConnell M J Kesteven) 06-nov-1992
- 39.3/026 EXTRA STATIONS FOR THE COMPACT ARRAY (J L Caswell L Staveley-smith) 19-nov-1992
- 39.3/027 THE AUSTRALIA TELESCOPE DATA ARCHIVING PROBLEM — SEE 39.2.014
- 39.3/028 AT COMPACT ARRAY BANDPASS VARIABILITY (R J Sault) 25-mar-1993
- 39.3/028a A 21-CM MULTI-BEAM RECEIVER (R D Ekers K C Freeman R F Haynes D S Mathewson L Staveley-smith A E Wright) 19-mar-1993
- 39.3/029 HI MULTIBEAM RECEIVER: RECORD OF PLANNING SESSION 16-sep-1993
- 39.3/030 AUSTRALIA TELESCOPE COMPACT ARRAY AUTOMATIC TURRET ROTATION (D Mcconnell) 20-aug-1993
- 39.3/031 COMPACT ARRAY POINTING THERMAL EFFECTS (R Wark D Hong D Mcconnell) 22-sep-1993
- 39.3/032 AUSTRALIA TELESCOPE COMPACT ARRAY SPECTRAL PERFORMANCE AT 8 GHZ (D Mcconnell K R Anantharamaiah W E Wilson) 23-sep-1993
- 39.3/033 THE SIGN OF STOKES V, ET CETERA (R J Sault) 14-jan-1994
- 39.3/034 RECEIVER SYSTEM TEMPERATURES (R Gough) 19-jan-1994 (duplicates 39.2/022)
- 39.3/035 MULTIBEAM PROJECT CORRESPONDENCE (L Staveley-smith) 03-mar-1994
- 39.3/036 MULTIBEAM PROJECT CORRESPONDENCE (L Staveley-smith) 23-feb-1994
- 39.3/038 PRELIMINARY INTERFERENCE SURVEY – NO. 1 (MOPRA) (M W Sinclair M A Bowen) 11-may-1994
- 39.3/039 AUSTRALIA TELESCOPE COMPACT ARRAY FLUX CALIBRATION (D Mcconnell D J Mckay)
- 39.3/040 A REVISED FLUX SCALE FOR THE AT COMPACT ARRAY (J Reynolds) 29-jul-1994
- 39.3/041 SETI CIRCULAR POLARISATION REQUIREMENTS (G Graves) 05-sep-1994
- 39.3/043 MODIFIED MOPRA CONVERSION SYSTEM (G Graves) 20-sep-1994
- 39.3/044 THE PARKES SPECTRAL LINE BASELINE PROBLEM- WILL IT BE EXACERBATED BY THE UPGRADE? (M Kesteven) 09-dec-1994
- 39.3/045 THE SYN PROJECTION (M Calabretta M Kesteven) 03-mar-1995
- 39.3/046 PRIMARY BEAMS AND MOSAICING (Miriad User’s Guide)
- 39.3/047 THE COST OF THE MM UPGRADE OF THE MOPRA ANTENNA (M Kesteven) 07-jan-1995
- 39.3/048 MODIFICATIONS TO THE MOPRA ANTENNA TO ENHANCE THE MM WAVE CAPACITY (J M Payne) mar-1995
- 39.3/049 SUMMARY OF THE INITIAL TESTS OF THE MOPRA MM RECEIVER (G Moorey M Kesteven) 30-dec-1994
- 39.3/050 PHASE CORRECTION (P Hall) 24-apr-1995
- 39.3/051 COMPACT ARRAY HOLOGRAPHY (M J Kesteven G R Graves D J Mckay) 30-jun-1995
- 39.3/052 NARRABRI S-BAND BEAM PATTERNS (M Kesteven) 10-jul-1995
- 39.3/053 SOME COMPARISONS BETWEEN THE DIFFERENT DESIGN CONCEPTS UNDERPINNING THE WIDEBAND QUAD-RIDGED CIRCULAR-WAVEGUIDE OMTS FOR THE L/S AND THE C/X DUAL-BANDS (B MacA Thomas) 16-aug-1995
- 39.3/054 AN L-S BAND FRONT END UPGRADE FOR THE COMPACT ARRAY AND MOPRA (M W Sinclair) 01-nov-1995
- 39.3/055 EFFECT OF OMT FIN SHAPE ON THE ATNF L/S HORN PERFORMANCE: RPP NO 3794 (C Granet) 29-sep-1995
- 39.3/056 A FUTURE DEVELOPMENT PROJECT THE L-S BAND UPGRADE (M Kesteven) 18-dec-1995
- 39.3/057 EFFECTIVE SPECTRAL RESOLUTION OF THE ATNF CORRELATOR (N Killeen) 24-jan-1996
- 39.3/058 SOME SIMULATIONS OF SELF-CALIBRATION FOR THE AT (R J Sault) 16-apr-1991
- 39.3/059 SOME SIMPLE MOSAICING CALCULATIONS FOR THE AT (R J Sault) 16-apr-1991
- 39.3/060 LIMITS TO THE AT ANTENNA POINTING PRECISION (I) – TILTMETER TESTS (M Kesteven D J Mckay) 16-nov-1996
- 39.3/062 PARKES HOLOGRAPHY AND OPTICAL SURVEY (M Kesteven G Graves M Calabretta B Parsons) 02-nov-1995
- 39.3/063 THE 1KT ARRAY: SOME THOUGHTS ON THE OVERALL ANTENNA SPECIFICATIONS AND CONCEPTS FOR AND PERFORMANCE OF A (100M) PHASED-ARRAY ELEMENT (B MacA Thomas) 03-feb-1997
- 39.3/064 THE 1KT – APPLICATION OF PHASED ARRAY TECHNOLOGY (PART 2) (B MacA Thomas) 01-may-1997
- 39.3/065 INTERFERENCE EXCISION TECHNICAL MEETING NO. 1 (B MacA Thomas) 14-apr-1997
- 39.3/066 CEDUNA-1 SURVEY (M Kesteven B Parsons) 11-oct-1996
- 39.3/067 CEDUNA-1 SECOND SURVEY (M Kesteven B Parsons) 25-jun-1997
- 39.3/068 AUSTRALIA TELESCOPE DATA ANALYSIS: CONTINUUM MAPPING USING THE AIPS SYSTEM (R F Haynes R T Stewart N Junkes) 08-nov-1989
- 39.3/069 HAS THE PARKES REFLECTOR SURFACE CHANGED AS A RESULT OF THE UPGRADE? (M Kesteven B Thomas G Graves B Parsons M Calabretta) 28-jan-1997
- 39.3/070 MECHANICAL STABILITY OF THE AT SUBREFLECTORS (M Kesteven B Parsons) 08-jul-1997
- 39.3/071 FIELD ROTATION DUE TO AN ANTENNA’S POINTING MODEL (M Kesteven) 24-jul-1997
- 39.3/072 ANTENNA ON THE RAIL OBSERVATIONS (M Kesteven B Parsons) 03-oct-1997
- 39.3/073 THE AUSTRALIA TELESCOPE MILLIMETRE-WAVE UPGRADE (P J Hall J W Brooks M W Sinclair W E Wilson M J Kesteven) 03-oct-1997
- 39.3/074 THE TIDBINBILLA 34M BEAM WAVEGUIDE ANTENNA: FEEDING ARRANGEMENTS AND OPERATIONS AT 4.8 TO 6.8 GHZ (B MacA Thomas) 22-oct-1997
- 39.3/075 MEASUREMENT OF FIBEROPTIC LINK PERFORMANCE (J W Lamb) 09-apr-1997
- 39.3/076 THE 1KT PROJECT: ANTENNA REFERENCE RADIATION PATTERNS FOR ARRAY ELEMENTS FOR SYSTEM PERFORMANCE EVALUATION: PART 1 – REFLECTOR ANTENNAS (B MacA Thomas) 29-jan-1998
- 39.3/077 THE TIDBINBILLA 34 M BEAM WAVEGUIDE ANTENNA: USE OF THE 2.86 TO 5.35 GHZ HORN FOR 4.8 GHZ OPERATION (B MacA Thomas) 03-feb-1998
- 39.3/079 THE SIDELOBE PERFORMANCE OF THE UNIVERSITY OF TASMANIA CEDUNA 30 M ANTENNA NEAR 6.7 GHZ (B MacA Thomas) 29-oct-1997
- 39.3/080 THE UNIVERSITY OF TASMANIA CEDUNA ANTENNA: FEED HORN DESIGN AND PERFORMANCE NEAR 22 GHZ (B MacA Thomas) 16-mar-1998
- 39.3/082 THE GRAVITATIONAL DEFORMATION OF THE CEDUNA-1 ANTENNA (M Kesteven B Parsons) 09-jul-1998
- 39.3/083 TRITON ANTENNA SURVEYS (B Parsons B Wilcockson M Kesteven) 30-jul-1998
- 39.3/084 THE BASELINE RIPPLE PROBLEM: THE MEASUREMENT PROGRAM AT PARKES IN JUNE 1998 (B MacA Thomas G R Graves L Staveley-smith M J Kesteven R M Price) 16-jan-1999
- 39.3/085 AT SUBREFLECTOR ADJUSTMENT – THEORY AND PRACTICE (M Kesteven B Parsons) 02-dec-1998
- 39.3/086 EMA-FN98/13: DROP IN GAIN OF THE AUSTRALIA TELESCOPE ANTENNAS AT 86 GHZ DUE TO AXIAL SUBREFLECTOR MOVEMENT (C Granet) 16-dec-1998
- 39.3/087 AN EVOLUTIONARY APPROACH TO THE DEVELOPMENT OF THE “SQUARE KILOMETRE ARRAY” (B MacA Thomas) 22-jan-1999
- 39.3/088 THE ATCA 13-CM POLARIMETRIC RESPONSE (R J Sault M Ehle) 14-may-1996
- 39.3/089 SOME GENERAL ANTENNA CONSIDERATIONS FOR LF-SKA AND WHY THE “MAGIC-CARPET” CONCEPT COULD BE A “DINGO” (B MacA Thomas) 11-feb-1999
- 39.3/091 THE ATNF NARRABRI FACILITIES: SUMMARY OF THREE STUDIES TO ENABLE THE 6-KM ANTENNA TO BE SHIFTED TO THE MAIN 3-KM TRACK (B MacA Thomas) feb-1999
- 39.3/092 30GHZ HOLOGRAPHY RECEIVERS (G Graves) 19-apr-1999
- 39.3/093 HOLOGRAPHY INSTRUMENTATION (G Graves M Kesteven) 06-may-1999
- 39.3/095 FOCAL-PLANE ARRAYS – SOME BASIC CHARACTERTISTICS AND AND AN APPLICATION TO HF-SKA (B MacA Thomas) 16-jul-1999
- 39.3/096 SKA: MATCHING THE SPECIFICATIONS AND ANTENNA TECHNOLOGIES (B MacA Thomas) 19-jul-1999
- 39.3/097 THE ANALYSIS OF AN INPUT TRANSITION FOR THE CEDUNA HORN NEAR 12GHZ (B MacA Thomas C Granet) 03-aug-1999
- 39.3/102 Circular Polarization User’s Guide (D Rayner) 16-nov-2000
- 39.3/103 Sydney Uni. Report on Optical Fibre signal distribution & Filters for SKA Array Interference Mitigation (RA Minasian/KE Alameh) 30-aug-2000
- 39.3/104 1. LO leakage into Water Vapour Radiometer (G Graves/M Bowen) 20-dec-2000
- 39.3/105 2. Calibration using noise from the fibre optic Local Oscillator System (G Graves/M Bowen/M Leach) 28-jan-2001
- 39.3/106 Wide-band circular polarizers made with quarter-wave and half-wave plates (P Lilie) 6-nov-2001
- 39.3/107 Cryogenic Plumbing Installation, Mt Pleasant observatory, Tasmania (P Sykes) 7-may-2001
- 39.3/108 18-25 GHz Prime-focus horn for Uni of Tasmania antenna, Hobart (B Thomas) 4-may-2001
- 39.3/109 Photogrammetric Measurement Report: Deformation Measurements of Antenna #2 ATNF, Narrabri by Vision Metrology Services Uni of Melbourne 12-feb-2002
- 39.3/111 The Photogrammetric Study of a Narrabri Antenna (M Kesteven/B Parsons) 15-apr-2002
- 39.3/112 Parkes Wind Loading – Calibration (M Kesteven) 29-apr-2002
- 39.3/113 mm Performance of the ATCA Antennas I: Effects of Tilts & Displacements in the Optics (R Subrahmanyan) 23-apr-2002
- 39.3/114 Parkes Rack Bolts Report (J Reynolds) 6-may-2002
- 39.3/115 mm Performance of the ATCA Antennas II: Effects of Gravity Deformations (R Subrahmanyan) 25-july-2002
- 39.3/116 ATCA Antenna Beam Patterns and Aperture Illumination (J Cole & R Subrahmanyan) 30-July-2002
- 39.3/117 Mm performance of the ATCA antennas III: compensating for the effects of gravity deformation (R Subrahmanyan) 23-Sept-2002
- 39.3/119 Gravity Distortion Correction via Subreflector Motion (Bill Imbriale ) 19-Mar-2003
- 39.3/120 Fibre Optic Transmitter Module B1 & Receiver module B2 technical manual Ver 2.1 (Brett Hiscock) 08-Aug-2003
- 39.3/121 Aperture illumination in the Compact Array antennas across the 12mm band (Nicholas Ebner & Ravi Subrahmanyan) 19-Jan-2004
- 39.3/122 Results from the CA Seeing Monitor (Enno Middelbert) 19-Apr-2005
- 39.3/123 ATNF Scientific Computing Group Review (Vince McIntyre) 3-May-2005
- 39.3/124 ATCA Flux Density Scale at 12mm (Bob Sault) 7-Dec-2003
- 39.3/125 Review of Narrabri/Mopra On-line Software (Bob Sault, John Reynolds & Dave McConnell) 16-Nov-2005
- 39.3/126 An Analysis of Tropospheric Properties of the Mileura Site (Bob Sault) 18-Oct-2005
- 39.3/127 Cryogenic Performance of Millitech Model FBI-22 Waveguide Isolator (Russell Bolton & Russell Gough) 2-May-2006
- 39.3/128 Commissioning Report for the ATCA L/S Receiver Upgrade Project (N. M. McClure-Griffiths, J. B. Stevens, & S. P. O’Sullivan) 8-June-2011
- 39.3/129 Calibrating linear polarization data at 16 cm with ATCA/CABB (D. Schnitzeler, J. Banfield, B. Emonts, C. Hales, E, Lenc, R. Norris, N. McClure-Griffiths, D. McConnell, S. O’Sullivan and J. Stevens) 7-December-2011
- 39.3/130 Required cadence for the 10/50cm dual band receiver for pulsar observations (G. Hobbs, M. Keith, W. Coles, R. Manchester, R. Shannon, V. Ravi) 11-July-2012
- 39.9/131 Modelling sources in broad-band ATCA visibility data (D. McConnell) 17-January-2013
- 39.9/132 Accelerometer measurements on the Parkes Telescope (D. McConnell, B. Preisig) 13-December-2012
- 39.3/133 ATCA focus observations at 4cm and 15mm (M. Wieringa, R. Wark) 31-May-2016
40.3 Parkes Technical Document Series
- 40.3.1/033 Parkes Radiotelescope – Report on Telescope Behaviour & Operation Under Wind Loading Conditions (Connell Wagner Pty Ltd) April-1993
- 40.3.1/038 Pointing and Carriage Motion Algorithms – Preliminary Version (M.Kesteven) 22-Nov-1995
- 40.3.1/039 Parkes 64M Radiotelescope: Estimated Surface Power Transmission Factors for the perforated and mesh surfaces
- 40.3.1/101 Parkes windloading following the JPL upgrade (Mike Kesteven) 8-Apr-2002
- 40.3.1/102 Parkes Counterweight Issues (Mike Kesteven) 4-May-2002
- 40.3.1/103 Parkes 64m balance – a recalibration (Brett Preisig, Tim Ruckley and Rob Hollow) May-2015
- 40.3.2/001 Parkes RFI Environment and Mitigation (R. N. Manchester) May-2013
- 40.3.2/002 Development of an Ultra-Wideband (UWL) Receiver System at Parkes (R. N. Manchester (for the PPTA team), E. Carretti, R. P. Norris and C. J. Phillips) 7-Jun-2013
LBA eVLBI memos
- eVLBI Science Case (Chris Phillips) July 2004
- CABB eVLBI Requirements (Chris Phillips) November 2005
- LBA disk recorder header format (Chris Phillips) November 2005
- eVLBI network requirements (Chris Phillips) February 2006
- VSIB onboard modifications
- Recording system documentation (outdated) (Richard Dodson) September 2004
- BG2 connection schematic
- BG3 connection schematic (outdated)
- Polarisation gain terms for LBA data (Richard Dodson)
- Absolute Polarisation Calibration for LBA from ATCA data (Richard Dodson and Tasso Tzioumis)
- DiFX Performance Testing
- Continuous Calibration for LBA with CABB (Richard Dodson and Jamie Stevens)
SKA memos
- Anechoic chamber measurement of spectral glitches in SKALA4.1 antenna (Ravi Subrahmanyan, David Kenney, David Minchin) March 2021
- Modelling the total powers of antennas in AAVS2 at 110 MHz (Ravi Subrahmanyan) March 2021
- The spectral response of embedded antennas in AAVS2 (Ravi Subrahmanyan) April 2021
- Modelling the crosstalk between antennas in AAVS2 (Ravi Subrahmanyan) May 2021
- Modelling the station beam of AAVS2 at 110 MHz (Ravi Subrahmanyan) July 2021
- Modelling Calibration Imaging intrastation correlations in AAVS2 at 110 MHz (Ravi Subrahmanyan) November 2021
- Stokes Imaging Beamforming with SKA Low Station AAVS2 (Ravi Subrahmanyan) March 2022